About this video: a four-building steel production complex in Needles, California
In this 0:59 video, Toro shows a production facility in Needles, California, made up of four identical 100x200x24 Toro steel buildings. The project took 586,000 lbs of steel delivered on 20 truckloads, and the buildings were erected by Quality Steel Erectors with two-tone diagonal cladding on every wall.
The complex uses Toro straight-wall steel buildings, engineered for commercial and agricultural production. See more enterprise projects.
- Four identical buildings. Each one is 100x200x24.
- 586,000 lbs of steel. Delivered on 20 truckloads.
- Two-tone diagonal cladding. A custom finish on every wall.
Key moments in the video
Jump to any part of the 0:59 video on YouTube.
- Four buildings, 586,000 lbs of steelAerial views of the four finished buildings and the steel that went into them.
- Four 100x200x24 production facilitiesThe four identical buildings, each 100x200x24.
- Preparing the siteEarthmoving equipment grades the site.
What's on screen (this video has no narration)
0:15 Aerial view of the finished buildings. On screen: "586 Thousand lbs of Steel".
0:30 A lift and telehandler beside one of the buildings. On screen: "4 (100' x 200' x 24') Cannabis Production Facilities".
0:44 A grader and water truck prepare the site.
This video is set to music with no narration. These notes describe what appears on screen at each point.
The buildings in this video
Four identical 100x200x24 Toro steel buildings for a production facility in Needles, California.
586,000 lbs of steel
Four buildings, 20 truckloadsThe four buildings took 586,000 lbs of steel, which the YouTube description says arrived on 20 truckloads.
100x200x24 each
Erected by Quality Steel ErectorsEach building is 100 ft wide, 200 ft long and 24 ft high, finished with two-tone diagonal cladding on every wall.

Every Toro building is engineered in-house for your site's snow, wind and seismic loads and comes with engineer-stamped drawings. Buildings are made in 30+ manufacturing facilities certified to standards including CSA A660, CWB, AISC and AWS D1.1. Engineering is led by Noah Sinclair, our in-house structural engineer.
Questions about large production facilities
Still unsure? Price your building and a building specialist will walk you through it.
How big is this facility?
It is four identical buildings, each 100x200x24, or 20,000 sq ft each and 80,000 sq ft in total.
How much steel did the project use?
586,000 lbs of steel, delivered on 20 truckloads.
Who erected the buildings?
Quality Steel Erectors. Toro doesn't install buildings: every kit is engineered for bolt-together assembly by the customer or a contractor they choose.
Can steel buildings be engineered for California seismic codes?
Yes. Every Toro building is engineered for the snow, wind and seismic loads at its site.
Do I get engineer-stamped drawings?
Yes. Every Toro building comes with engineer-stamped drawings for your location, which you can use for your building permit.
How much does a large production facility cost?
Toro steel building kits start at $19 USD per sq ft in the U.S. and $26 CAD per sq ft in Canada. Your site's loads and codes, along with size, framing system, openings and options, have a big impact on the final price, so reach out for pricing on your specific building.