About this video: a 60x80x20 steel building frame assembled in 4 days
In this 1:15 video, the steel frame of a 60x80x20 Toro building goes up in Ontario in 4 days. With no wall or roof panels on yet, you can see the clear-span frame of columns, rafters and secondary steel take shape day by day.
It's a Toro straight-wall steel building, the kind used for warehouses, workshops and storage. Toro doesn't install buildings: every kit is engineered for bolt-together assembly.
- Day 2: the first frames. A telehandler and lift raise the first columns and rafters.
- Day 3: the skeleton. The main frames stand, with a scissor lift working inside.
- Day 4: the full frame. The complete clear-span skeleton, ready for panels.
Key moments in the video
Jump to any part of the 1:15 video on YouTube.
- The first frames go upA telehandler and lift raise the first columns and rafters.
- Day 3: the skeleton takes shapeThe main frames are up, with a scissor lift working inside.
- Day 4: the full frameThe complete steel skeleton stands, ready for wall and roof panels.
What's on screen (this video has no narration)
0:19 Day 2: a telehandler lifts a rafter while a lift raises crew to the columns. On screen: "Toro 60 x 80 x 20, ON, Canada".
0:37 Day 3: the main frames stand, with a scissor lift inside.
0:56 Day 4: the full frame, including the end walls.
This video is set to music with no narration. These notes describe what appears on screen at each point.
The building in this video
A 60x80x20 Toro steel building frame, 4,800 sq ft, assembled in Ontario in 4 days.
Raising the frames
Day 2A telehandler lifts the rafters into place while a crew in a lift connects them to the columns.
The full skeleton
Day 4By day 4, the complete clear-span frame stands, including the end walls, ready for the wall and roof panels.

Every Toro building is engineered in-house for your site's snow, wind and seismic loads and comes with engineer-stamped drawings. Buildings are made in 30+ manufacturing facilities certified to standards including CSA A660, CWB, AISC and AWS D1.1. Engineering is led by Noah Sinclair, our in-house structural engineer.
Questions about large steel building frames
Still unsure? Price your building and a building specialist will walk you through it.
How long did this frame take to put up?
The steel frame went up in 4 days.
How big is a 60x80x20 steel building?
It's 60 ft wide, 80 ft long and 20 ft high, or 4,800 sq ft.
What does clear-span mean?
A clear-span building has no interior columns, so the floor is open from wall to wall for equipment, storage or work areas.
Does Toro supply the foundation?
No. Toro provides the structural reactions for every building, so a local contractor can build the foundation to spec. Anchor bolts are included with cold-formed buildings and are an add-on for arch and red iron buildings.
Does Toro install the building?
No. Toro doesn't install buildings. Every kit is engineered for bolt-together assembly by the customer or a local contractor.
How much does a 60x80 steel building cost?
Toro steel building kits start at $19 USD per sq ft in the U.S. and $26 CAD per sq ft in Canada. Your site's loads and codes, along with size, framing system, openings and options, have a big impact on the final price, so reach out for pricing on your specific building.