What do you need to know about metal buildings in Minnesota? Minnesota sets ground snow loads by county in its state building code: 60 psf in northern counties such as St. Louis, Cass and Beltrami, and 50 psf everywhere else. Frost goes deep, with Duluth requiring footings 60 inches down. Qualifying agricultural buildings are generally exempt from the state code, but local zoning still applies. Every Toro steel building kit is engineered for your county's loads and ships with engineer-stamped drawings.
Key takeaways
- Your county sets the snow load. Minnesota's rules assign 60 psf to northern counties and 50 psf to the rest of the state.
- Frost protection is serious. Footings in the north go down 5 feet; plan your foundation early.
- Farm buildings may be exempt. Qualifying agricultural buildings are generally exempt from the state building code, but zoning still applies.
- Toro handles the engineering. Your kit ships with stamped drawings and the structural reactions your contractor needs.
Building codes for metal buildings in Minnesota
Minnesota builds to the Minnesota State Building Code, which adopts the International Building and Residential Codes with Minnesota amendments. Minnesota Rules chapter 1303 adds state-specific provisions, including ground snow loads by county and minimum footing depths for frost protection.
Cities and many counties enforce the code through their building departments. Qualifying agricultural buildings, such as barns and machine sheds on a working farm, are generally exempt from the state building code, though your county can still require zoning or land-use permits.
Toro's in-house engineers design every building to the code and loads that apply at your address and stamp the drawings for your permit. Learn more about how Toro engineers each building, or compare states on our building codes by state page.
Sources: Minnesota Rules 1303.1700 (ground snow load) · Minnesota Rules 1303.1600 (footing depth) · City of Duluth code summary.
Snow, wind and frost loads in Minnesota
Unlike most states, Minnesota writes its ground snow loads directly into state rules by county. Here's how the numbers break down:
| Area | Ground snow load | Design wind speed | Frost depth | Source |
|---|---|---|---|---|
| Northern counties (including Aitkin, Beltrami, Carlton, Cass, Crow Wing, Hubbard, St. Louis) | 60 psf | Site-specific | Deeper zone | Minnesota Rules 1303.1700 |
| All other counties | 50 psf | Site-specific | Shallower zone | Minnesota Rules 1303.1700 |
| City of Duluth | 60 psf (42 psf roof) | 115 mph | 60 in. | Duluth residential code summary |
Minnesota Rules part 1303.1700 lists every county in the 60 psf zone, and part 1303.1600 sets minimum footing depths. Confirm with your building department; Toro's engineers use the values for your exact address.
Snow loads by county
Minnesota Rules part 1303.1700 sets a 60 psf ground snow load for northern counties and 50 psf for all others. Duluth's residential code summary lists 60 psf ground snow and a 42 psf roof snow load. Roof pitch, purlin spacing and panel gauge are designed around those numbers, and drifts against taller walls add load in specific spots.
Wind on open farmland
Duluth lists a 115 mph design wind speed, with exposure set site by site. Open prairie sites in western and southern Minnesota see more exposure than wooded ones. Your engineer accounts for exposure and large door openings, and anchor bolts are included with every cold-formed Toro building.
Frost depth and foundations
Minnesota Rules part 1303.1600 sets minimum footing depths for frost protection, deeper in the north; Duluth requires 60 inches. Toro doesn't supply foundations, but every building comes with the structural reactions your contractor needs. See our guides to steel building foundations and container cover foundations.

How to get a permit
Permits usually come from your city or county building department. If you're building a qualifying farm building, ask your county whether it's exempt from the building code and what zoning approval you still need.
- Call your city or countyAsk whether a building permit is required, what setbacks apply and whether your building qualifies as an agricultural building.
- Confirm your snow zoneCheck whether your county is in the 60 psf or 50 psf snow zone; your Toro building specialist can confirm it with you.
- Design and order your buildingDesign it in the free 3D designer or with a building specialist. Toro requires a 25% deposit before your order goes to engineering.
- Submit the stamped drawingsToro's engineers prepare engineer-stamped drawings for your site's loads, which you submit with your permit application.
- Build the foundation before freeze-upGet frost-protected footings in before the ground freezes. Delivery usually takes 2 to 8 weeks, and every kit bolts together on site.
Want the full checklist? Read our steel building planning guide and how to build a steel building.
Get a Minnesota quote
Tell us your size, address and how you'll use the building, and a building specialist will send a quote engineered for your local loads. Pricing starts at US$19 per sq ft; your final price depends on size, options and the loads at your site.
Toro buildings in Minnesota
From a dairy barn near Duluth to a container cover on the southwest prairie, these are real Toro buildings standing in Minnesota today.
40x80x10 cow barnMahtowa, MN · Cold-formed steel · See the project
24x24x10 two-car garageBrowerville, MN · Cold-formed steel · See the project
27x40x4 container coverPipestone, MN · Commercial use · See the projectSee more customer builds on our projects page, or read how a customer built a 32x56 steel shop in Amo, Indiana.
Watch a Toro building go up
Bell's Farming buildFarm building assembly · Watch the video
35x70 winter build10-day time-lapse · Watch the video
Neil's 30x50x16 M-Model buildStep-by-step DIY build · Watch the videoBrowse every build, review and time-lapse in our video library.
Building for Minnesota winters
Deep cold and heavy snow
Minnesota winters are long and cold, and condensation is the hidden enemy inside an unheated metal building. Toro buildings use Galvalume Plus steel, and straight-wall buildings carry a 25–40-year paint warranty depending on panel and finish (see our warranty). For a heated shop or garage, add insulation; our guide to insulating a steel building explains the options.
Farm and livestock buildings
Steel is a natural fit for dairy, beef and machine storage. Read what to consider for a steel farm building, different uses of farm buildings and the best steel buildings for hay storage.
Choosing the right building
Choose a straight-wall building, either cold-formed (M-Model) or red iron, or an arch-style Quonset building. Read the guide to pre-engineered metal buildings and check current U.S. steel building prices.
Need a building sooner?
Toro makes 500+ buildings a month, and about 10% are never delivered because a customer's plans change. These clearance buildings are offered at a discount, re-engineered for your site if needed and come with stamped drawings. Inventory changes daily, so the fastest way to see what's available is to call, or browse current U.S. clearance inventory.
Frequently asked questions
Still have questions about building in Minnesota? Price your building and a building specialist will walk you through it.
What snow load does a metal building need in Minnesota?
Minnesota Rules set a 60 psf ground snow load in northern counties, including St. Louis, Cass and Beltrami, and 50 psf in all other counties. Toro's engineers design your building for the load that applies to your county and site.
Do I need a permit for a metal building in Minnesota?
Usually, yes. Cities and counties issue building permits under the Minnesota State Building Code. Qualifying agricultural buildings are generally exempt from the building code, but zoning and land-use approvals can still apply, so check with your county.
How deep do footings need to be in Minnesota?
Minnesota Rules part 1303.1600 sets minimum footing depths for frost protection, deeper in the north. Duluth requires 60 inches. Toro provides the structural reactions so your contractor can build the foundation to spec.
Does Toro install buildings in Minnesota?
No. Toro designs, engineers and ships pre-engineered steel building kits. You assemble the kit yourself or hire a local contractor, using the stamped drawings and structural reactions we provide.
How much does a metal building cost in Minnesota?
Toro pricing starts at US$19 per square foot. Your final price depends on size, framing, options and the loads at your site, so a building specialist confirms it with a quote.
How long does delivery to Minnesota take?
Delivery usually takes 2 to 8 weeks, and your building specialist confirms timing for your order. You handle unloading on site, and our operations team keeps you updated along the way.
Related building types
Steel garages | Workshops | Agricultural buildings | Metal barns | Storage buildings | Container covers
Get a steel building quote for your Minnesota project
Tell us what you're building and where, and Toro Steel Buildings will send a quote engineered for your local snow, wind and seismic loads.

