Metal buildings in Illinois follow whatever code your city, village or county has adopted, because Illinois has no statewide building code. In northern Illinois, typical values are 25 to 30 psf of ground snow, 107 to 115 mph winds and 42-inch frost; Joliet, for example, uses 25 psf, 115 mph and 42 inches.
Key takeaways
- Your city or county sets the code. Illinois leaves building codes to local governments, so the rules change across city and county lines.
- Frost protection is 42 inches up north. Northern Illinois communities commonly require 42-inch footings.
- Snow and wind are moderate. Published values run 25 to 30 psf of snow and 107 to 115 mph wind.
- Toro handles the engineering. Your kit ships with stamped drawings and the structural reactions your contractor needs.
How building codes work for metal buildings in Illinois
Illinois has no statewide building code for most private buildings. Units of local government, including cities, villages and counties, adopt the codes of their choice, usually editions of the International Building and Residential Codes with local amendments. The state energy code does apply statewide.
Unincorporated areas follow their county's code where the county has adopted one, as Will and Grundy counties have. Some rural counties have limited or no building code enforcement, but zoning still applies.
Toro's in-house engineers design your building for the loads at your address and stamp the drawings. Learn more about how Toro engineers each building, or compare states on our building codes by state page.
Sources: ICC: Illinois code adoption · City of Joliet design criteria · City of Rock Island code amendments.
Snow, wind, seismic and frost loads in Illinois
Illinois communities publish their own design criteria. Here are examples from northern Illinois and the Quad Cities:
| Jurisdiction | Snow load | Design wind speed | Seismic / frost | Source |
|---|---|---|---|---|
| City of Joliet | 25 psf ground | 115 mph | Category B · 42 in. | Joliet residential design criteria |
| Will County (unincorporated) | 30 psf ground (with reductions) | 115 mph | Ask the county | Will County building code |
| Grundy County | 25 psf ground | 107 mph | Category B · 42 in. | Grundy County code |
| City of Rock Island | 30 psf roof | 107 mph | Category A · 42 in. | Rock Island code amendments (2025) |
Values are from each jurisdiction's published criteria and can change. Toro's engineers use the values for your exact address.
Snow and wind
Northern Illinois communities commonly design for 25 to 30 psf of ground snow, and lake-effect snow can add more near Lake Michigan. Published wind speeds run from 107 to 115 mph, and Illinois sees frequent severe storms and tornadoes; codes don't design for a direct tornado hit, but an engineered, properly anchored steel building is far more resilient than a lightly built shed. Anchor bolts are included with every cold-formed Toro building.
Seismic design in southern Illinois
Most of northern Illinois is in low seismic design categories, but southern Illinois lies near the New Madrid and Wabash Valley seismic zones, where categories run higher. Toro's engineers design the bracing and connections for the category that applies to your site.
Frost depth and foundations
Joliet, Grundy County and Rock Island all require 42-inch footings. Toro doesn't supply foundations, but every building comes with the structural reactions your contractor needs to build one to spec. See our guides to steel building foundations and container cover foundations.

How to get a permit
Permits come from your city or village, or from your county in unincorporated areas where it has adopted a code. Start with your local building department.
- Call your city, village or county Ask whether a building permit is required, which code applies and which design loads to use.
- Check zoning and setbacks Confirm setbacks, height limits and any rules for accessory buildings on your property.
- Design your building Design it in the free 3D designer, on your own or with a building specialist. Toro requires a 25% deposit before your order goes to engineering.
- We engineer it and stamp the drawings Toro's in-house engineers check your design against your site's loads and local code, then prepare engineer-stamped drawings for your permit application.
- Pour the foundation and assemble Your contractor builds the foundation to Toro's structural reactions. Delivery usually takes 2 to 8 weeks, and every kit bolts together on site.
Want the full checklist? Read our steel building planning guide and how to build a steel building.
Get a Illinois quote
Tell us your size, address and how you'll use the building, and a building specialist will send a quote engineered for your local loads. Pricing starts at US$19 per sq ft; your final price depends on size, options and the loads at your site.
Toro buildings in Illinois
From a finished steel guest house to secure storage for a classic car collection, these are real Toro buildings in Illinois.
20x26x10 steel guest house Roscoe, IL · Residential use · See the project
14x44x10 classic car storage New Lenox, IL · 616 sq ft · See the projectSee more customer builds on our projects page, or compare with our guides to metal buildings in Missouri and Minnesota.
Watch a Toro building go up
20x24 M-Model garage Customer review, Mississippi · Watch the video
M-Model DIY installation How the kit bolts together · Watch the video
Neil's 30x50x16 M-Model build Step-by-step DIY build · Watch the videoBrowse every build, review and time-lapse in our video library.
Building for Illinois weather
Cold winters, hot summers
Illinois swings from cold, snowy winters to hot, humid summers. Toro buildings use Galvalume Plus steel, and straight-wall buildings carry a 25–40-year paint warranty depending on panel and finish (see our warranty). Plan ventilation, and add insulation for a year-round space.
Garages, guest houses and car storage
Illinois customers use Toro buildings for everything from classic car storage to a finished guest house. Read choosing the right metal shop kit and our guide to insulating a steel building.
Choosing the right building
Choose a straight-wall building, either cold-formed (M-Model) or red iron, or an arch-style Quonset building. Read the guide to pre-engineered metal buildings and check current U.S. steel building prices. Planning a garage? See our steel garage kits, two-car garage dimensions and carport kits.
Keep reading: real projects, videos and guides
Need a building sooner?
Toro makes 500+ buildings a month, and about 10% are never delivered because a customer's plans change. These clearance buildings are offered at a discount, re-engineered for your site if needed and come with stamped drawings. Inventory changes daily, so the fastest way to see what's available is to call, or browse current U.S. clearance inventory.
Frequently asked questions
Still have questions about building in Illinois? Price your building and a building specialist will walk you through it.
Does Illinois have a statewide building code?
Not for most private buildings. Cities, villages and counties adopt their own codes, usually editions of the International Codes, while the state energy code applies statewide.
Do I need a permit for a metal building in Illinois?
Usually, yes, wherever your city, village or county has adopted a building code. Ask your local building department, and check zoning rules for accessory buildings. Toro supplies the engineer-stamped drawings for your application.
What snow load and frost depth apply in Illinois?
Northern Illinois communities commonly use 25 to 30 psf of ground snow and 42-inch frost depth; Joliet, for example, uses 25 psf and 42 inches. Toro's engineers design your building for the values at your exact address.
Does Toro install buildings in Illinois?
No. Toro designs, engineers and ships pre-engineered steel building kits. You assemble the kit yourself or hire a local contractor, using the stamped drawings and structural reactions we provide.
How much does a metal building cost in Illinois?
Toro pricing starts at US$19 per square foot. Your final price depends on size, framing, options and the loads at your site, so a building specialist confirms it with a quote.
How long does delivery to Illinois take?
Delivery usually takes 2 to 8 weeks, and your building specialist confirms timing for your order. You handle unloading on site, and our operations team keeps you updated along the way.
Related building types
Steel garages | Workshops | Agricultural buildings | Storage buildings | Carport kits | Container covers
Get a steel building quote for your Illinois project
Tell us what you're building and where, and Toro Steel Buildings will send a quote engineered for your local snow, wind and seismic loads.

