• Home
  • 50×50 Steel Building Indoor Skate Park in Carr, Colorado

50×50 Steel Building Indoor Skate Park in Carr, Colorado

Structural Engineer

Published

19 Nov 2026 · 5 minutes Read

#1 Metal Buildings in Ohio | Toro Buildings Dream Shop – Thrive Base
50x50Steel building, in feet
2,500Square feet, clear span
24 ftEave height for the ramps
80 psfMezzanine floor load

What does a 50x50 steel building look like as an indoor skate park? This one is a 2,500 sq ft clear-span cold-formed steel building in Carr, Colorado, 50 ft wide, 50 ft long and 24 ft to the eave, with an engineered mezzanine that carries the skate ramp decks at 80 psf. Toro designed, engineered and supplied this 50x50 steel building for Robert, a customer who wanted a private indoor skate park on the open plains of Weld County.

It is a Toro cold-formed steel building, the system our customers choose for recreational buildings, shops and storage. Toro has supplied pre-engineered steel buildings for more than 40 years and sold more than 100,000 of them, and every one is engineered for the snow, wind and seismic loads at its exact site. This 50x50 steel building was engineered to the 2018 International Building Code, as Weld County required at the time, with the foundation design included, and it was assembled locally by the owner's team.

Key takeaways

  • Built for big ramps. A 24 ft eave and a clear span leave room for a full-size vert ramp with no columns in the way.
  • An engineered mezzanine. A 10 ft deep mezzanine at 12 ft high, designed for 80 psf, carries the ramp decks along one endwall.
  • Engineered for the Front Range. Designed for 115 mph winds in Exposure C, a 30 psf ground snow load and a 30 in. frost depth.

50x50 steel building specs

The building as ordered and engineered.

Detail50x50 Steel Building Indoor Skate Park
LocationCarr, Weld County, Colorado, USA
BuildingCold-formed steel building (M-Model)
Size50 ft wide x 50 ft long
Eave height24 ft
Floor area2,500 sq ft
Roof3:12 gable, Galvalume
BaysFive bays, with bearing endwall frames
Mezzanine10 ft deep along one endwall, 12 ft to the top of the floor, 80 psf
DaylightWhite translucent wall panels in all five bays from 21 ft up, five 4 x 4 ft and one 2 x 2 ft window frames
OpeningsOne 12 x 14 ft overhead door opening and two 3 ft 4 in. x 7 ft 2 in. walk door frames
Overhangs1 ft 6 in. overhangs with soffit on all four walls
ColoursCharcoal Gray walls, Galvalume roof, Bone White trim, ridge cap and soffit
Code2018 International Building Code, as adopted by Weld County
OrderedFebruary 2024

Price a building like this

Tell us your size, site and use, and a Toro building consultant will come back with an engineered, code-compliant quote.

Watch: from sealed drawings to finished skate park

This 50x50 steel building went from sealed engineering drawings to a finished indoor skate park. Watch the sequence, then see inside the building below.

This 50 x 50 ft clear-span steel building in Carr, Colorado gives riders room to skate all year, with 24 ft walls, a mezzanine and engineering for 115 mph winds. The video goes from the sealed engineering drawings to the finished skate park.

Indoor skate park vert ramp inside a 50x50 steel building in Carr, Colorado
The vert ramp under the clear span, with the deck and stairs on the left.
Skate ramp deck on the mezzanine of a 50x50 steel building with windows
The deck along the wall, with windows and translucent panels for daylight.
Clear-span steel roof framing over an indoor skate ramp in Colorado
The clear-span roof over the ramp, with lighting strung between the frames.

Design your own building the same way with the free 3D building designer: set the width, length, height, doors, lean-tos, roof pitch, colours and wainscot, then send it to a building consultant for an engineered price.

Want a building like this one?

Send us your size, site and how you will use it, and a building consultant will come back with an engineered quote.

Engineered for Carr, Colorado: the design loads

Carr sits at about 5,780 ft on the open plains of northern Weld County, with strong winds, cold winters and a 30 in. frost depth. These are the design criteria for this 50x50 steel building.

115 mphDesign wind speed, Exposure C
30 psfGround snow load (1.44 kPa)
80 psfMezzanine live load
30 in.Frost depth for footings
Design criteriaValue
Building code2018 International Building Code, as adopted by Weld County, with drawings sealed for the site
Ground snow load30 psf (1.44 kPa)
Wind115 mph (3-second gust), Exposure C. All of unincorporated Weld County is Exposure C, open terrain
SeismicLow: Ss = 0.167 g, S1 = 0.052 g, Seismic Design Category B
ElevationAbout 5,780 ft
Frost depth30 in.
MezzanineDesigned for an 80 psf floor load, 12 ft to the top of the floor
Roof3:12 slope with 1 ft 6 in. overhangs and soffits on all four walls
FoundationFoundation design included with the project, based on the building reactions and the 30 in. frost depth

Get loads engineered for your site

Every quote is engineered for the snow, wind and seismic loads where your building will stand.

Engineering the skate ramp mezzanine

A raised deck that is part of the building, not an afterthought.

The skate ramps needed a raised deck along one wall. Rather than build it as a separate platform, the mezzanine was engineered into this 50x50 steel building from the start:

  • 10 ft deep along one endwall, spanning the building's width in the first bay.
  • 12 ft from the floor to the top of the mezzanine floor, which sets the deck height for the ramp.
  • Designed for an 80 psf live load, enough for riders, gear and spectators on the deck.
  • Bearing endwall frames carry the mezzanine and endwall loads.

The ramps themselves were built by the owner on top of the structure. If you plan a mezzanine, loft or deck, tell your building specialist the height and the load you need before the order is finalized, because the frames and foundation are engineered for it.

The mezzanine was engineered into the frames from day one, so the ramp deck is part of the building.
Toro engineering, on mezzanines and raised decks

Daylight, overhangs and openings

A bright interior without losing wall space for ramps.

  • White translucent wall panels run through all five bays from 21 ft up, letting daylight in high above the ramps.
  • Five 4 x 4 ft window frames and one 2 x 2 ft frame for light and views.
  • A 12 x 14 ft overhead door opening for ramp materials, equipment and vehicles.
  • Two walk door frames (3 ft 4 in. x 7 ft 2 in.).
  • 1 ft 6 in. overhangs with soffit on all four walls, which shade the walls and keep rain off them.
  • Charcoal Gray walls with Bone White trim, ridge cap and soffit, under a Galvalume roof.

Why a 50x50 steel building works for an indoor skate park

2,500 sq ft, 24 ft high and no columns.

A skate park needs open floor and height more than anything. A 50x50 steel building gives both:

  • 2,500 sq ft of clear span, so ramps and transitions can go anywhere.
  • A 24 ft eave leaves headroom above a full-size vert ramp and the deck.
  • A 3:12 roof adds more height in the middle of the building.
  • A square plan fits a vert ramp across the width with room for a run-up and seating.
  • The same building works as a shop, gym or storage building if the use changes later.

For other recreation uses, see our arenas and recreational buildings and our guide to building a sports facility with a steel building.

Plan your clear-span shop

Tell us your doors, cranes and layout, and get an engineered, code-compliant quote within 1 business day.

What to watch for when building in Weld County, Colorado

The issues that matter most on the Front Range plains.

  • Wind. All of unincorporated Weld County is Exposure C, open terrain, so walls, doors and the roof must be designed for full wind exposure. This building was designed for 115 mph.
  • Frost and foundations. Footings must reach below the 30 in. frost depth. This project included a foundation design based on the building reactions.
  • Hail and sun at altitude. At about 5,780 ft, roof panels and finishes take strong sun, and hail is common on the Front Range, so choose panels and colours with that in mind.
  • Permits and codes. Weld County requires a building permit for new buildings, and it updated its adopted International Codes in June 2026. This building was designed to the 2018 IBC that applied in 2024; new buildings are designed to the current edition. Check the county's building permit applications before you order.
  • Use and occupancy. A private skate park is treated differently from one open to the public. Public recreation buildings fall under assembly occupancy rules with stricter exits and fire protection, so confirm the use with the county early.
  • Heating and energy code. If you plan to heat the building, the county enforces the 2018 IECC for Climate Zone 5, which affects insulation.

See our steel buildings in Colorado page for more on Colorado codes and projects.

On the open plains of Weld County, every wall faces full wind exposure. Design for Exposure C from the start.
Front Range design note

Building in Colorado?

Get a quote engineered for your exact site, wind exposure and frost depth, within 1 business day.

What does a 50x50 steel building cost?

Starting prices, and what moves them.

New Toro steel building kits start at $19 per sq ft (USD) in the United States and $26 per sq ft (CAD) in Canada, and every building is quoted to meet the loads and codes for your location and use. For a 50x50 steel building, the biggest price drivers are:

  • Eave height. A 24 ft eave uses more steel than a standard 12 to 16 ft building.
  • Wind and snow loads at your site. Exposure C wind on open land needs heavier framing.
  • A mezzanine, sized for the height and load you need.
  • Translucent panels, windows and doors.
  • Overhangs, soffits and trim.
  • Delivery distance to your site.

The building kit doesn't include the foundation, erection or interior fit-out, so budget for those separately. Compare sizes on our steel building sizes page, or read our U.S. steel building prices guide.

Need a building sooner, or for less?

New, unused clearance buildings from cancelled orders are engineered for your site like any Toro building.

Why customers choose Toro for engineered steel buildings

More than 40 years and 100,000+ buildings.

  • More than 40 years supplying pre-engineered steel buildings, with more than 100,000 buildings sold.
  • In-house engineering, with every building designed for the snow, wind and seismic loads at its exact site and shipped with engineer-stamped drawings.
  • Made in the USA for U.S. buildings.
  • Precision laser-cut components that arrive ready to bolt together, for 30 to 50% faster construction than conventional wood framing.
  • A 25 to 40-year paint warranty on straight-wall buildings, depending on panel and finish.
  • A U.S. office in Grand Rapids, Michigan, and building specialists who speak English, French, Spanish, Portuguese, Italian, Persian and Chinese.

Start your quote

Tell us your size, site and use, and get a free quote engineered for your loads and code.

How this building came together

Toro engineers and supplies the kit; the owner's team builds it.

1

Specification and 3D design

Toro and the owner

Size, mezzanine, doors and daylight panels set, then modelled in 3D.

2

Engineering

Toro

Designed to the 2018 IBC for the Carr site, with the foundation design.

3

Permit and foundation

Owner or contractor

Drawings submitted to Weld County; foundation built below the frost line.

4

Delivery

Toro ships, the owner unloads

The complete kit shipped to Carr, Colorado.

5

Assembly

Owner or contractor

Frames, mezzanine and panels bolted together on site. Toro doesn't install.

The building consultant who sold this building

Every Toro building has one consultant from first call to delivery.

Scott Dutcher

Building Consultant · Toro Steel Buildings

Scott Dutcher sold this 50x50 steel building and worked with Robert from the first sketch of a skate park through engineering, the mezzanine design and delivery. He helps customers across the U.S. plan commercial, storage and specialty buildings.

See Scott's projects and work with Scott

544Buildings sold
CommercialSpecialty

More buildings Scott Dutcher has sold

Talk to Scott about your building

Get an engineered quote for your size, site and loads, ask about new and unlisted clearance inventory, or see Scott's past projects.

50x50 steel building FAQs

Still planning your build? Price your building and a building consultant will walk you through it.

How big is a 50x50 steel building?

A 50x50 steel building has 2,500 square feet of floor space. With a clear span there are no interior columns, so the whole floor is usable. This one in Carr, Colorado also has a 24 ft eave height and a 10 ft deep mezzanine along one wall.

How much does a 50x50 steel building cost?

New Toro steel building kits start at $19 per sq ft (USD) in the United States and $26 per sq ft (CAD) in Canada, and every building is quoted to meet the loads and codes for your location and use. Eave height, wind and snow loads, a mezzanine, doors, windows and delivery distance have the biggest effect on the final price.

Can a steel building be used as an indoor skate park?

Yes. A clear-span steel building gives open floor for ramps and transitions, and a tall eave gives headroom for vert ramps. This 50x50 steel building in Carr, Colorado has a 24 ft eave and an engineered mezzanine that carries the ramp deck.

What loads is a steel building designed for in Weld County, Colorado?

This Carr building was designed for a 115 mph wind speed in Exposure C, a 30 psf ground snow load and Seismic Design Category B, with a 30 in. frost depth, under the 2018 International Building Code. Every Toro building is engineered for its own site, so your loads depend on your exact location.

Can you add a mezzanine to a steel building?

Yes, when it is engineered with the building. This mezzanine is 10 ft deep, 12 ft to the top of the floor and designed for 80 psf. Tell your building specialist the height and load you need before the order is finalized, because the frames and foundation are designed for it.

Do I need a building permit for a steel building in Weld County?

Yes. Weld County requires a building permit for new buildings in unincorporated areas, and it updated its adopted International Codes in June 2026. Every Toro building comes with engineer-stamped drawings for your exact site, which is what the building department asks for.

What foundation does a 50x50 steel building need?

The foundation is designed for the building reactions on the stamped drawings and your local frost depth, which is 30 in. in Weld County. This project included a foundation design, and the foundation was built locally by the owner's team.

How long does it take to build a 50x50 steel building?

Delivery of a Toro building kit usually takes 2 to 8 weeks, and your building specialist confirms timing. The components arrive precision-cut and ready to bolt together, so construction is typically 30 to 50% faster than conventional wood framing.

Written by Noah Sinclair, Toro's in-house structural engineer. Every Toro building is engineered for your site's snow, wind and seismic loads and comes with engineer-stamped drawings. Toro has supplied pre-engineered steel buildings for more than 40 years and sold more than 100,000 buildings.

Follow Toro

Keep reading

Browse all articles

Planning a building like this?

Toro Steel Buildings engineers your kit for your site's wind, snow and frost, with a quote within 1 business day.

Join 100,000+ customers who built with Toro

Tell us your size, location and how you'll use the building. A Toro building consultant will come back with an engineered, code-compliant quote within 1 business day. Prefer to talk? Call 1-888-995-3432, or browse in-stock clearance buildings at reduced prices.