• Home
  • Vidéothèque
  • Whitehorse Commercial Steel Building: Step-by-Step Time-Lapse Assembly | Toro Steel

Whitehorse Commercial Steel Building: Step-by-Step Time-Lapse Assembly | Toro Steel

58x110x18Commercial building, in feet
6,380Square feet
WhitehorseYukon

About this video: a 58x110x18 commercial steel building in Whitehorse, Yukon

In this 1:18 video, a 58x110x18 Toro commercial steel building goes up step by step in Whitehorse, Yukon, from the slab to the main frames and secondary steel. The building is engineered for northern conditions, including heavy snow loads.

It's a Toro straight-wall steel building for commercial use, the same kind used for warehouses. Every building is engineered in-house by Toro's engineering team for its site.

  • From the slab. A lift starts the first columns on the concrete slab.
  • The main frames. Columns and rafters span the 58 ft width.
  • Secondary steel. Girts and purlins go on to carry the wall and roof panels.

Key moments in the video

Jump to any part of the 1:18 video on YouTube.

  1. Starting on the slabThe first steel goes up on the concrete slab.
  2. The main frames are upColumns and rafters stand across the building.
  3. Secondary framingGirts and purlins go on around the frame.
What's on screen (this video has no narration)

0:19 A lift works on the first columns on the slab. On screen: "58 x 110 x 18, Whitehorse, YT".

0:39 The main frames stand, with a telehandler and lifts working.

0:58 Girts and purlins are going on around the frame.

This video is set to music with no narration. These notes describe what appears on screen at each point.

The building in this video

A 58x110x18 Toro commercial steel building, 6,380 sq ft, in Whitehorse, Yukon.

Built for the North

Whitehorse, Yukon

The building is engineered for the loads at its Whitehorse site, including heavy northern snow. Every Toro building comes with engineer-stamped drawings for its location.

Frame and secondary steel

Step-by-step assembly

The main columns and rafters go up first, then the girts and purlins that carry the wall and roof panels.

The steel frame of the 58x110x18 Whitehorse building with girts going on, lifts working, and mountains in the background
The Whitehorse building going up

Every Toro building is engineered in-house for your site's snow, wind and seismic loads and comes with engineer-stamped drawings. Buildings are made in 30+ manufacturing facilities certified to standards including CSA A660, CWB, AISC and AWS D1.1. Engineering is led by Noah Sinclair, our in-house structural engineer.

Questions about commercial steel buildings in cold climates

Still unsure? Price your building and a building specialist will walk you through it.

Can a steel building handle northern snow loads?

Yes. Every Toro building is engineered for the snow, wind and seismic loads at its site. This one was designed for Whitehorse, Yukon.

How big is this building?

It's 58 ft wide, 110 ft long and 18 ft high, or 6,380 sq ft.

What are girts and purlins?

Girts run horizontally along the walls and purlins along the roof. They connect the main frames and carry the wall and roof panels.

Is insulation included?

Insulation is an optional add-on, which most cold-climate buildings include.

Does Toro install the building?

No. Toro doesn't install buildings. Every kit is engineered for bolt-together assembly by the customer or a contractor they choose.

How much does a commercial steel building cost?

Toro steel building kits start at $19 USD per sq ft in the U.S. and $26 CAD per sq ft in Canada. Your site's loads and codes, along with size, framing system, openings and options, have a big impact on the final price, so reach out for pricing on your specific building.

Built for strength

Why Get Your Steel Building from Toro

Everything you need for a steel building that lasts — engineered, delivered and easy to put up.

01

Custom engineering

Custom-engineered steel building systems designed for demanding industrial applications and complex structural requirements.

02

Clear-span layouts

Clear-span layouts that maximize usable interior space for equipment, production, storage, and crane operations.

03

Wind and lateral loads

Specialized engineering options for high wind loads, lateral loads, and other project-specific performance needs.

04

Fast erection

Fast erection compared to many traditional construction methods, helping keep large-scale projects on schedule.

05

Coordinated delivery

Coordinated delivery and logistics support to keep materials arriving efficiently on site.

06

Built to last

Durable, low-maintenance building systems designed for long-term performance and backed by strong warranty protection.

Join 100,000+ customers who built with Toro

Tell us your size, location and how you'll use the building. A Toro building consultant will come back with an engineered, code-compliant quote within 1 business day. Prefer to talk? Call 1-888-995-3432, or browse in-stock clearance buildings at reduced prices.