• Home
  • Vidéothèque
  • 35×70 Steel Building Time-Lapse: Winter Build in 10 Days | Toro Steel Buildings

35×70 Steel Building Time-Lapse: Winter Build in 10 Days | Toro Steel Buildings

35x70Steel building, in feet
2,450Square feet
10 daysTo erect, per the description

About this video: a 35x70 steel building time-lapse in winter

In this 0:37 video, a 35x70 Toro steel building is erected in a winter time-lapse, with day counters marking the progress as the steel frame goes up on a snow-covered site. The YouTube description says the building went up in 10 days.

It's a Toro straight-wall steel building, a common choice for workshops and storage. Toro doesn't install buildings: every kit is engineered for bolt-together assembly.

  • Built in winter. The steel frame goes up on a snow-covered site.
  • Day by day. On-screen counters mark day 4 and day 5 of the build.
  • About 10 days. The description says the building was erected in 10 days.

Key moments in the video

Jump to any part of the 0:37 video on YouTube.

  1. The frame goes upSteel frames rise on a snow-covered site, with a lift working alongside.
  2. Day 5 and onwardThe time-lapse continues from day 5 toward the finished building.
What's on screen (this video has no narration)

0:09 Day 4: steel frames stand on a snow-covered site, with a lift and a telehandler working.

0:18 Day 5: more frames are up.

0:28 A text graphic fills the screen.

This video is set to music with no narration. These notes describe what appears on screen at each point.

The building in this video

A 35x70 Toro straight-wall steel building, 2,450 sq ft, erected in winter.

A winter build

Day 4

By day 4, steel frames stand on the snow-covered site, with a lift and a telehandler working on the structure.

About 10 days

Day 5 onward

The day counter moves to day 5 as more of the frame goes up. The YouTube description says the whole building was erected in 10 days.

35x70 steel building time-lapse: steel frames standing on a snow-covered site, with a lift and a telehandler, and a Day 04 counter on screen
Day 4 of the 35x70 build

Every Toro building is engineered in-house for your site's snow, wind and seismic loads and comes with engineer-stamped drawings. Buildings are made in 30+ manufacturing facilities certified to standards including CSA A660, CWB, AISC and AWS D1.1. Engineering is led by Noah Sinclair, our in-house structural engineer.

Questions about putting up a steel building

Still unsure? Price your building and a building specialist will walk you through it.

How long does it take to put up a 35x70 steel building?

The YouTube description says this one was erected in 10 days. Your timing depends on the crew, equipment, weather and the building itself.

Can you put up a steel building in winter?

This one went up on a snow-covered site. Every Toro building is engineered for the snow, wind and seismic loads at its location.

How big is a 35x70 steel building?

It's 2,450 sq ft. Toro designs every building to the width, length and height you need.

Does Toro install the building?

No. Toro doesn't install buildings. Every kit is engineered for bolt-together assembly by the customer or a local contractor.

How long does delivery take?

Delivery usually takes 2 to 8 weeks. Your building specialist will confirm the timing for your order, and you'll need to arrange unloading when the kit arrives.

How much does a 35x70 steel building cost?

Toro steel building kits start at $19 USD per sq ft in the U.S. and $26 CAD per sq ft in Canada. Your site's loads and codes, along with size, framing system, openings and options, have a big impact on the final price, so reach out for pricing on your specific building.

Built for strength

Why Get Your Steel Building from Toro

Everything you need for a steel building that lasts — engineered, delivered and easy to put up.

01

Custom engineering

Custom-engineered steel building systems designed for demanding industrial applications and complex structural requirements.

02

Clear-span layouts

Clear-span layouts that maximize usable interior space for equipment, production, storage, and crane operations.

03

Wind and lateral loads

Specialized engineering options for high wind loads, lateral loads, and other project-specific performance needs.

04

Fast erection

Fast erection compared to many traditional construction methods, helping keep large-scale projects on schedule.

05

Coordinated delivery

Coordinated delivery and logistics support to keep materials arriving efficiently on site.

06

Built to last

Durable, low-maintenance building systems designed for long-term performance and backed by strong warranty protection.

Join 100,000+ customers who built with Toro

Tell us your size, location and how you'll use the building. A Toro building consultant will come back with an engineered, code-compliant quote within 1 business day. Prefer to talk? Call 1-888-995-3432, or browse in-stock clearance buildings at reduced prices.