About this video: a 35x70 steel building time-lapse in winter
In this 0:37 video, a 35x70 Toro steel building is erected in a winter time-lapse, with day counters marking the progress as the steel frame goes up on a snow-covered site. The YouTube description says the building went up in 10 days.
It's a Toro straight-wall steel building, a common choice for workshops and storage. Toro doesn't install buildings: every kit is engineered for bolt-together assembly.
- Built in winter. The steel frame goes up on a snow-covered site.
- Day by day. On-screen counters mark day 4 and day 5 of the build.
- About 10 days. The description says the building was erected in 10 days.
Key moments in the video
Jump to any part of the 0:37 video on YouTube.
- The frame goes upSteel frames rise on a snow-covered site, with a lift working alongside.
- Day 5 and onwardThe time-lapse continues from day 5 toward the finished building.
What's on screen (this video has no narration)
The building in this video
A 35x70 Toro straight-wall steel building, 2,450 sq ft, erected in winter.
A winter build
Day 4By day 4, steel frames stand on the snow-covered site, with a lift and a telehandler working on the structure.
About 10 days
Day 5 onwardThe day counter moves to day 5 as more of the frame goes up. The YouTube description says the whole building was erected in 10 days.

Every Toro building is engineered in-house for your site's snow, wind and seismic loads and comes with engineer-stamped drawings. Buildings are made in 30+ manufacturing facilities certified to standards including CSA A660, CWB, AISC and AWS D1.1. Engineering is led by Noah Sinclair, our in-house structural engineer.
Questions about putting up a steel building
Still unsure? Price your building and a building specialist will walk you through it.
How long does it take to put up a 35x70 steel building?
The YouTube description says this one was erected in 10 days. Your timing depends on the crew, equipment, weather and the building itself.
Can you put up a steel building in winter?
This one went up on a snow-covered site. Every Toro building is engineered for the snow, wind and seismic loads at its location.
How big is a 35x70 steel building?
It's 2,450 sq ft. Toro designs every building to the width, length and height you need.
Does Toro install the building?
No. Toro doesn't install buildings. Every kit is engineered for bolt-together assembly by the customer or a local contractor.
How long does delivery take?
Delivery usually takes 2 to 8 weeks. Your building specialist will confirm the timing for your order, and you'll need to arrange unloading when the kit arrives.
How much does a 35x70 steel building cost?
Toro steel building kits start at $19 USD per sq ft in the U.S. and $26 CAD per sq ft in Canada. Your site's loads and codes, along with size, framing system, openings and options, have a big impact on the final price, so reach out for pricing on your specific building.
Related videos
Browse every video in the Toro video library, read more customer testimonials, or see Toro's workshops, storage buildings and steel building sizes.












