40×60 Metal Building Kit Time-Lapse: Up in 5 Days in Ontario

40x60Red iron farm building, in feet
2,400Square feet
5 daysTo put up
3Local contractors

About this video: a 40x60 red iron metal building kit up in 5 days

In this 0:36 video, a Toro red iron 40x60 metal building kit goes up in time-lapse on a farm in Ontario, Canada, from the bare slab to blue walls, white trim and two large roll-up doors. Three local contractors put it up in 5 days with little more than a scissor lift, and it was engineered for extremely heavy snow loads and high winds.

It's a Toro red iron steel building, used here to store expensive farm machinery. See more agricultural buildings and equipment storage buildings. Toro doesn't install buildings: every kit is engineered for bolt-together assembly, and this one was put up by local contractors.

  • Up in 5 days. Three local contractors and a scissor lift, from slab to finished building.
  • Built for Ontario snow and wind. Engineered for extremely heavy snow loads and high winds.
  • Two large roll-up doors. Sized for tractors, trucks and RVs.

Key moments in the video

Jump to any part of the 0:36 video on YouTube.

  1. Columns and walls go upThe red iron columns go up from 0:02, and the blue wall panels start going on at 0:10.
  2. Door framing and roofThe framing for the two large roll-up doors starts at 0:13, and the roof panels go on from 0:20.
What's on screen (this video has no narration)

0:02 The red iron columns start going up on the concrete slab.

0:10 Blue wall panels start going on.

0:13 Framing for the two large roll-up door openings begins.

0:20 Roof panels start going on, with the crew working from a scissor lift.

0:27 The building is nearly finished: blue walls, white trim and two large door openings.

This video is set to music with no narration. These notes describe what appears on screen at each point.

The building in this video

A 40x60 Toro red iron steel building, 2,400 sq ft, for storing farm machinery in Ontario, Canada.

Up in 5 days

3 local contractors and a scissor lift

Three local contractors put the building up in 5 days, with minimal equipment beyond a scissor lift. Toro's drawings and bolt-together red iron frame kept the build moving fast.

Built for the farm

Heavy snow, high wind, big doors

The owner needed somewhere to store expensive farm machinery. The building was engineered for extremely heavy Ontario snow loads and high winds, with two large roll-up doors sized for tractors, trucks and RVs.

A nearly finished 40x60 blue red iron metal building on an Ontario farm, with white trim and two large door openings, and lifts and materials on site
The 40x60 farm building nearly finished

Every Toro building is engineered in-house for your site's snow, wind and seismic loads and comes with engineer-stamped drawings. Buildings are made in 30+ manufacturing facilities certified to standards including CSA A660, CWB, AISC and AWS D1.1. Engineering is led by Noah Sinclair, our in-house structural engineer.

Questions about 40x60 metal building kits

Still unsure? Price your building and a building specialist will walk you through it.

How long does it take to put up a 40x60 metal building?

This 40x60 red iron building went up in 5 days, with three local contractors and minimal equipment beyond a scissor lift. Your timing depends on your crew, equipment and site.

Can a metal building handle heavy Ontario snow?

Yes. This building was engineered for extremely heavy snow loads and high winds at its Ontario site. Every Toro building is engineered for the snow, wind and seismic loads where it will stand.

Can a 40x60 fit tractors, trucks and RVs?

Yes. This one has two large roll-up doors sized for tractors, trucks and RVs. Toro engineers the framed openings to your sizes, and most customers buy the doors themselves from a local supplier.

How big is a 40x60 metal building?

A 40x60 metal building gives you 2,400 sq ft. Toro designs every building to the width, length and height you need.

Does Toro supply the foundation?

No. Toro provides the structural reactions for every building, so a local contractor can build the foundation to spec. Anchor bolts are an add-on for red iron buildings.

How much does a 40x60 metal building kit cost?

Toro steel building kits start at $19 USD per sq ft in the U.S. and $26 CAD per sq ft in Canada. Your site's loads and codes, along with size, framing system, openings and options, have a big impact on the final price, so reach out for pricing on your specific building.

Built for strength

Why Get Your Steel Building from Toro

Everything you need for a steel building that lasts — engineered, delivered and easy to put up.

01

Custom engineering

Custom-engineered steel building systems designed for demanding industrial applications and complex structural requirements.

02

Clear-span layouts

Clear-span layouts that maximize usable interior space for equipment, production, storage, and crane operations.

03

Wind and lateral loads

Specialized engineering options for high wind loads, lateral loads, and other project-specific performance needs.

04

Fast erection

Fast erection compared to many traditional construction methods, helping keep large-scale projects on schedule.

05

Coordinated delivery

Coordinated delivery and logistics support to keep materials arriving efficiently on site.

06

Built to last

Durable, low-maintenance building systems designed for long-term performance and backed by strong warranty protection.

Join 100,000+ customers who built with Toro

Tell us your size, location and how you'll use the building. A Toro building consultant will come back with an engineered, code-compliant quote within 1 business day. Prefer to talk? Call 1-888-995-3432, or browse in-stock clearance buildings at reduced prices.