About this video: a DIY steel building installation with an M-Model
In this 1:11 DIY steel building installation video, an M-Model cold-formed steel building goes up with a few people helping, using ladders and a lift to set the columns and build out the frame beside a home.
The M-Model is Toro's cold-formed straight-wall steel building, made by Toro and engineered for bolt-together assembly. It's a popular choice for garages and workshops.
- A few helpers. The frame goes up with a small crew.
- Columns set by hand. Two people stand a column into place.
- Ladders and a lift. Simple equipment is enough to build out the frame.
Key moments in the video
Jump to any part of the 1:11 video on YouTube.
- The frame goes upThe cold-formed frame rises beside the house, with a lift and ladders.
- Setting columns by handTwo people stand a column into place.
- Building out the frameThe crew continues the frame from a lift.
What's on screen (this video has no narration)
0:18 Two people lift a dark red cold-formed column into place, with ladders nearby.
0:35 The frame beside the house, with an orange lift and crew working at the top.
0:53 Toro end card: "North America's #1 Steel Building Kit Provider for 40+ Years".
This video is set to music with no narration. These notes describe what appears on screen at each point.
The building in this video
A DIY steel building installation: an M-Model cold-formed steel building assembled by a small crew beside a home.
A small crew
Columns by handTwo people stand a cold-formed column into place, showing how light the M-Model's components are to handle.
Ladders and a lift
Building out the frameThe crew works from an orange lift and ladders to connect the frame, with no heavy crane on site.

Every Toro building is engineered in-house for your site's snow, wind and seismic loads and comes with engineer-stamped drawings. Buildings are made in 30+ manufacturing facilities certified to standards including CSA A660, CWB, AISC and AWS D1.1. Engineering is led by Noah Sinclair, our in-house structural engineer.
Questions about DIY steel building installation
Still unsure? Price your building and a building specialist will walk you through it.
Can I install an M-Model myself?
Yes. Toro doesn't install buildings: every kit is engineered for bolt-together assembly by the customer or a local contractor.
What equipment do I need?
This video shows a small crew using ladders and a lift. Your assembly drawings set out what your building needs.
Are anchor bolts included?
Yes. Anchor bolts are included with every cold-formed building.
Does Toro supply the foundation?
No. Toro provides the structural reactions for every building, so a local contractor can build the foundation to spec.
How long does delivery take?
Delivery usually takes 2 to 8 weeks. Your building specialist will confirm the timing for your order, and you'll need to arrange unloading when the kit arrives.
How much does an M-Model cost?
Toro steel building kits start at $19 USD per sq ft in the U.S. and $26 CAD per sq ft in Canada. Your site's loads and codes, along with size, framing system, openings and options, have a big impact on the final price, so reach out for pricing on your specific building.
Related videos
Browse every video in the Toro video library, read more customer testimonials, or see Toro's cold-formed steel buildings, steel garages and workshops.











