{"id":78500,"date":"2026-10-17T12:00:58","date_gmt":"2026-10-17T16:00:58","guid":{"rendered":"https:\/\/torosteelbuildings.com\/?post_type=video_library&#038;p=78500"},"modified":"2026-11-04T11:23:32","modified_gmt":"2026-11-04T16:23:32","slug":"200x525-industrial-steel-building","status":"publish","type":"video_library","link":"https:\/\/torosteelbuildings.com\/fr\/video-library\/200x525-industrial-steel-building\/","title":{"rendered":"200&rsquo;x525&prime; Industrial Steel Building: Precast Facility Supply &#038; Build | Toro Steel"},"content":{"rendered":"<p><!-- TORO VIDEO WATCH PAGE \u00b7 \"200'x525' Industrial Steel Building: Precast Facility Supply & Build | Toro Steel\"     Video: https:\/\/www.youtube.com\/watch?v=_xE2eOecGAw \u00b7 0:55 (PT55S) \u00b7 published 2021-06-25 \u00b7 channel: Toro Steel Buildings \u00b7 WP post 78500     Paste into ONE Thrive Custom HTML element. The template's H1 + YouTube iframe stay ABOVE this block (real iframe, no facade).     H1 and VideoObject name match the YouTube title word for word. Key moments = YouTube chapters (0:00, 0:17, 0:33).     IMAGE SLOTS: YouTube thumbnail + auto-frames; swap slots 2\u20133 for full-size stills if available (search \"IMAGE SLOT\").     No hard-coded phone numbers (the site uses a dynamic number). All CSS is scoped to .tvp1. -->  <span aria-hidden=\"true\"><\/span><span aria-hidden=\"true\"><\/span>  <!-- STAT BAR -->                    <b>200&#215;525<\/b><span>Feet wide by long<\/span>        <b>105,000<\/b><span>Square feet under one roof<\/span>        <b>72<\/b><span>Truckloads of steel<\/span>        <b>3<\/b><span>25-ton crane systems<\/span>              <!-- ABOUT THIS VIDEO -->                    <span>Industrial project \u00b7 Precast facility<\/span><\/p>\n<h2>About this video: a 200&#215;525 industrial steel building for a precast plant<\/h2>\n<p>This 200&#215;525 industrial steel building video takes you onto the site of a 105,000 sq ft precast facility north of Toronto, two weeks into steel erection. Jeff Langner of Nuvocon Ltd., the erector, walks through the building&rsquo;s size, the steel delivery and the heavy crane beams inside.<\/p>\n<p>The building was designed to produce tilt-up precast concrete panels, and Jeff says it&rsquo;s the first building in North America to use an Italian precast technology. Toro supplied the engineered steel building and coordinated with the general contractor, process engineers, architects, and crane and door suppliers. A <a href=\"https:\/\/www.youtube.com\/watch?v=Fyn9LD83YW4\" target=\"_blank\" rel=\"noopener\">follow-up update<\/a> shows all the steel fully erected.<\/p>\n<ul aria-label=\"What the video shows\">\n<li><b>Industrial scale.<\/b> 200 ft wide by 525 ft long, with roughly 2.5 million pounds of steel delivered in 72 truckloads.<\/li>\n<li><b>Built for heavy cranes.<\/b> The structure is engineered for three 25-ton crane systems, and Jeff shows the 20 ft crane beams up close.<\/li>\n<li><b>Room to produce precast.<\/b> Two 60 ft pass-throughs and an RTS sandwich-panel roof system, designed around precast production.<\/li>\n<\/ul>\n<p>                    <span>Project video<\/span><\/p>\n<h3>Video details<\/h3>\n<p>                  Length0:55          PublishedJune 25, 2021          Channel<a href=\"https:\/\/www.youtube.com\/@ToroSteelBuildings\" target=\"_blank\" rel=\"noopener\">Toro Steel Buildings<\/a>          FeaturingJeff Langner, Nuvocon Ltd.          Building200x48x525 industrial          LocationNorth of Toronto, off Hwy 400          TopicsPrecast plant, crane-ready steel, erection                <a href=\"https:\/\/www.youtube.com\/watch?v=_xE2eOecGAw\" target=\"_blank\" rel=\"noopener\">Watch on YouTube<\/a>              <!-- KEY MOMENTS + TRANSCRIPT -->            <span>Chapters<\/span><\/p>\n<h2>Key moments in the video<\/h2>\n<p>Each moment matches a chapter in the YouTube video. Select a time to jump to it on YouTube.<\/p>\n<ol>\n<li><a href=\"https:\/\/www.youtube.com\/watch?v=_xE2eOecGAw&amp;t=0s\" target=\"_blank\" rel=\"noopener\">0:00<\/a><span><b>Meet the project: a 200&#215;525 Toro steel building<\/b><span>Jeff Langner of Nuvocon Ltd. introduces the 200 ft by 525 ft building and its roughly 2.5 million pounds of steel.<\/span><\/span><\/li>\n<li><a href=\"https:\/\/www.youtube.com\/watch?v=_xE2eOecGAw&amp;t=17s\" target=\"_blank\" rel=\"noopener\">0:17<\/a><span><b>72 truckloads and a precast plant<\/b><span>How the steel arrived and what the building is for: tilt-up precast panels and an Italian precast technology.<\/span><\/span><\/li>\n<li><a href=\"https:\/\/www.youtube.com\/watch?v=_xE2eOecGAw&amp;t=33s\" target=\"_blank\" rel=\"noopener\">0:33<\/a><span><b>Heavy crane beams and the roof system<\/b><span>A close look at the crane beams and the RTS sandwich-panel roof, two weeks into steel erection.<\/span><\/span><\/li>\n<\/ol>\n<p>              Read the video transcript                  <!-- From YouTube captions. Music cues removed; \"Nuvicon\" corrected to \"Nuvocon\". -->          <\/p>\n<h3>Meet the project<\/h3>\n<p>Jeff Langner here with Nuvocon Limited. We&rsquo;re erecting a Toro steel building, 200 foot wide by 525 feet long. Roughly two and a half million pounds of steel for this structure.<\/p>\n<h3>72 truckloads and a precast plant<\/h3>\n<p>We had 72 truckloads of steel. The purpose of this building is a precast plant for tilt-up precast panels, but the primary purpose of this building is the first building in North America to use an Italian technology.<\/p>\n<h3>Crane beams and the roof system<\/h3>\n<p>Example of the crane beams right here. They&rsquo;re heavy cranes in this building. These 20-foot-long beams are about 3,300 pounds.<\/p>\n<p>It&rsquo;s an RTS roof system, so it&rsquo;s a sandwich panel roof system. Right now we&rsquo;re two weeks into erecting.<\/p>\n<p>                      <!-- THE FIVE STAGES -->            <span>The Toro process<\/span><\/p>\n<h2>Where this video fits in a Toro build<\/h2>\n<p>This video covers delivery and erection. Here&rsquo;s the full path. Toro handles the first four stages, and Toro doesn&rsquo;t install buildings.<\/p>\n<ol>\n<li><span>1<\/span><br \/>\n<h3>Design<\/h3>\n<p><span>Toro<\/span><\/p>\n<p>Start in the 3D designer or with a design specialist.<\/p>\n<\/li>\n<li><span>2<\/span><br \/>\n<h3>Engineer<\/h3>\n<p><span>Toro<\/span><\/p>\n<p>Engineered for your site&rsquo;s loads and equipment. This one carries three 25-ton crane systems.<\/p>\n<\/li>\n<li><span>3<\/span><br \/>\n<h3>Manufacture<\/h3>\n<p><span>Toro<\/span><\/p>\n<p>Cut, drilled and labeled in our 30+ facilities. Arch and Quonset models are made by sister company Future Buildings.<\/p>\n<\/li>\n<li><span>4<\/span><br \/>\n<h3>Deliver<\/h3>\n<p><span>Toro \u00b7 in this video<\/span><\/p>\n<p>Usually 2 to 8 weeks. This project took 72 truckloads of steel, and the customer handles unloading.<\/p>\n<\/li>\n<li><span>5<\/span><br \/>\n<h3>Assemble<\/h3>\n<p><span>Nuvocon Ltd. \u00b7 in this video<\/span><\/p>\n<p>Bolt-together steel. Large industrial buildings go to an erection contractor.<\/p>\n<\/li>\n<\/ol>\n<p>      <!-- IMAGE SLOTS 1\u20133: slot 1 = YouTube thumbnail (1280x720, also the share image). Slots 2\u20133 = YouTube auto-frames (480x360). -->              <!-- IMAGE SLOT 1 --><img data-opt-id=1630640669  fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/i.ytimg.com\/vi\/_xE2eOecGAw\/maxresdefault.jpg\" alt=\"Jeff Langner of Nuvocon at the 200x525 Toro steel building site, with steel frames and stacked beams behind him\" width=\"1280\" height=\"720\" loading=\"lazy\" title=\"\">Jeff Langner, Nuvocon Ltd.        <!-- IMAGE SLOT 2 --><img data-opt-id=589667187  fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/i.ytimg.com\/vi\/_xE2eOecGAw\/hq2.jpg\" alt=\"Steel frames of the 200x525 precast facility going up, with boom lifts and a crane on site\" width=\"480\" height=\"360\" loading=\"lazy\" title=\"\">Frames going up        <!-- IMAGE SLOT 3 --><img data-opt-id=1094477356  decoding=\"async\" src=\"https:\/\/i.ytimg.com\/vi\/_xE2eOecGAw\/hq3.jpg\" alt=\"Stacked steel beams on site for the 200x525 Toro industrial steel building\" width=\"480\" height=\"360\" loading=\"lazy\" title=\"\">Steel on site            <\/p>\n<p>Our facilities are certified to fabrication and welding standards including CSA A660, CWB, AISC and AWS D1.1. Engineering is led by <a href=\"\/about\/noah-sinclair\/\">Noah Sinclair, our in-house structural engineer<\/a>. New to steel buildings? Start with our <a href=\"\/blog\/pemb-guide\/\">pre-engineered metal building guide<\/a>.<\/p>\n<p>        <!-- FAQ -->                    <span>FAQ<\/span><\/p>\n<h2>Questions about the precast facility<\/h2>\n<p>Planning an industrial building? <a href=\"\/price-my-building\/\">Price your building<\/a> and a building specialist will walk you through it.<\/p>\n<p>                    How big is the building in the video?<\/p>\n<p>It&rsquo;s 200 ft wide by 525 ft long, or 105,000 square feet. The YouTube listing gives the height as 48 ft, so the building is 200x48x525.<\/p>\n<p>        How much steel did the building take?<\/p>\n<p>Jeff Langner of Nuvocon says it&rsquo;s roughly 2.5 million pounds of steel, delivered in 72 truckloads.<\/p>\n<p>        What will the building be used for?<\/p>\n<p>It&rsquo;s a precast plant for producing tilt-up precast concrete panels. Jeff says it&rsquo;s also the first building in North America to use an Italian precast technology, which a follow-up video describes as making concrete columns, rafters and beams for multi-story buildings.<\/p>\n<p>        Can a Toro steel building support overhead cranes?<\/p>\n<p>Yes. This building was engineered for three 25-ton crane systems, and the video shows its heavy crane beams. Crane loads are part of the structural engineering, so share your crane specs with your building specialist early.<\/p>\n<p>        Who erected the building?<\/p>\n<p>Nuvocon Ltd. erected the steel. Toro designs, engineers, manufactures and delivers the building, and doesn&rsquo;t install buildings itself. Large industrial projects like this one are usually put up by an experienced erection contractor.<\/p>\n<p>        What roof system does the building use?<\/p>\n<p>According to Jeff, it uses an RTS roof system, which is a sandwich-panel roof system.<\/p>\n<p>        Does Toro supply the foundation?<\/p>\n<p>No. Toro provides the structural reactions for every building so a local contractor can build the foundation to spec. You also get engineer-stamped drawings for your location to use for your building permit.<\/p>\n<p>            <!-- SCHEMA: VideoObject (key moments + transcript) and FAQPage. Rank Math's own video schema is removed on this post. -->[tcb-script type=\u00a0\u00bbapplication\/ld+json\u00a0\u00bb]{\u00ab\u00a0@context\u00a0\u00bb: \u00ab\u00a0https:\/\/schema.org\u00a0\u00bb, \u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0VideoObject\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0200&rsquo;x525&prime; Industrial Steel Building: Precast Facility Supply &amp; Build | Toro Steel\u00a0\u00bb, \u00ab\u00a0description\u00a0\u00bb: \u00ab\u00a0Jeff Langner of Nuvocon Ltd. tours a 200&#215;525 Toro industrial steel building for a 105,000 sq ft precast plant north of Toronto, two weeks into erection: roughly 2.5 million pounds of steel, 72 truckloads, heavy crane beams and an RTS sandwich-panel roof.\u00a0\u00bb, \u00ab\u00a0uploadDate\u00a0\u00bb: \u00ab\u00a02021-06-25T11:27:40-07:00\u00a0\u00bb, \u00ab\u00a0duration\u00a0\u00bb: \u00ab\u00a0PT55S\u00a0\u00bb, \u00ab\u00a0isFamilyFriendly\u00a0\u00bb: true, \u00ab\u00a0thumbnailUrl\u00a0\u00bb: [\u00ab\u00a0https:\/\/i.ytimg.com\/vi\/_xE2eOecGAw\/maxresdefault.jpg\u00a0\u00bb, \u00ab\u00a0https:\/\/i.ytimg.com\/vi\/_xE2eOecGAw\/hqdefault.jpg\u00a0\u00bb], \u00ab\u00a0embedUrl\u00a0\u00bb: \u00ab\u00a0https:\/\/www.youtube.com\/embed\/_xE2eOecGAw\u00a0\u00bb, \u00ab\u00a0url\u00a0\u00bb: \u00ab\u00a0https:\/\/www.youtube.com\/watch?v=_xE2eOecGAw\u00a0\u00bb, \u00ab\u00a0inLanguage\u00a0\u00bb: \u00ab\u00a0en\u00a0\u00bb, \u00ab\u00a0publisher\u00a0\u00bb: {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Organization\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0Toro Steel Buildings\u00a0\u00bb, \u00ab\u00a0url\u00a0\u00bb: \u00ab\u00a0https:\/\/torosteelbuildings.com\u00a0\u00bb}, \u00ab\u00a0about\u00a0\u00bb: [{\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Thing\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0Industrial steel buildings\u00a0\u00bb}, {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Thing\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0Precast concrete plant\u00a0\u00bb}, {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Thing\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0Overhead crane buildings\u00a0\u00bb}], \u00ab\u00a0mentions\u00a0\u00bb: [{\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Organization\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0Nuvocon Ltd.\u00a0\u00bb}, {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Person\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0Jeff Langner\u00a0\u00bb}], \u00ab\u00a0hasPart\u00a0\u00bb: [{\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Clip\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0Meet the project: a 200&#215;525 Toro steel building\u00a0\u00bb, \u00ab\u00a0startOffset\u00a0\u00bb: 0, \u00ab\u00a0endOffset\u00a0\u00bb: 17, \u00ab\u00a0url\u00a0\u00bb: \u00ab\u00a0https:\/\/www.youtube.com\/watch?v=_xE2eOecGAw&amp;t=0s\u00a0\u00bb}, {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Clip\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a072 truckloads and a precast plant\u00a0\u00bb, \u00ab\u00a0startOffset\u00a0\u00bb: 17, \u00ab\u00a0endOffset\u00a0\u00bb: 33, \u00ab\u00a0url\u00a0\u00bb: \u00ab\u00a0https:\/\/www.youtube.com\/watch?v=_xE2eOecGAw&amp;t=17s\u00a0\u00bb}, {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Clip\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0Heavy crane beams and the roof system\u00a0\u00bb, \u00ab\u00a0startOffset\u00a0\u00bb: 33, \u00ab\u00a0endOffset\u00a0\u00bb: 55, \u00ab\u00a0url\u00a0\u00bb: \u00ab\u00a0https:\/\/www.youtube.com\/watch?v=_xE2eOecGAw&amp;t=33s\u00a0\u00bb}], \u00ab\u00a0transcript\u00a0\u00bb: \u00ab\u00a0Jeff Langner here with Nuvocon Limited. We&rsquo;re erecting a Toro steel building, 200 foot wide by 525 feet long. Roughly two and a half million pounds of steel for this structure. We had 72 truckloads of steel. The purpose of this building is a precast plant for tilt-up precast panels, but the primary purpose of this building is the first building in North America to use an Italian technology. Example of the crane beams right here. They&rsquo;re heavy cranes in this building. These 20-foot-long beams are about 3,300 pounds. It&rsquo;s an RTS roof system, so it&rsquo;s a sandwich panel roof system. Right now we&rsquo;re two weeks into erecting.\u00a0\u00bb}[\/tcb-script][tcb-script type=\u00a0\u00bbapplication\/ld+json\u00a0\u00bb]{\u00ab\u00a0@context\u00a0\u00bb: \u00ab\u00a0https:\/\/schema.org\u00a0\u00bb, \u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0FAQPage\u00a0\u00bb, \u00ab\u00a0mainEntity\u00a0\u00bb: [{\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Question\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0How big is the building in the video?\u00a0\u00bb, \u00ab\u00a0acceptedAnswer\u00a0\u00bb: {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Answer\u00a0\u00bb, \u00ab\u00a0text\u00a0\u00bb: \u00ab\u00a0It&rsquo;s 200 ft wide by 525 ft long, or 105,000 square feet. The YouTube listing gives the height as 48 ft, so the building is 200x48x525.\u00a0\u00bb}}, {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Question\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0How much steel did the building take?\u00a0\u00bb, \u00ab\u00a0acceptedAnswer\u00a0\u00bb: {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Answer\u00a0\u00bb, \u00ab\u00a0text\u00a0\u00bb: \u00ab\u00a0Jeff Langner of Nuvocon says it&rsquo;s roughly 2.5 million pounds of steel, delivered in 72 truckloads.\u00a0\u00bb}}, {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Question\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0What will the building be used for?\u00a0\u00bb, \u00ab\u00a0acceptedAnswer\u00a0\u00bb: {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Answer\u00a0\u00bb, \u00ab\u00a0text\u00a0\u00bb: \u00ab\u00a0It&rsquo;s a precast plant for producing tilt-up precast concrete panels. Jeff says it&rsquo;s also the first building in North America to use an Italian precast technology, which a follow-up video describes as making concrete columns, rafters and beams for multi-story buildings.\u00a0\u00bb}}, {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Question\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0Can a Toro steel building support overhead cranes?\u00a0\u00bb, \u00ab\u00a0acceptedAnswer\u00a0\u00bb: {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Answer\u00a0\u00bb, \u00ab\u00a0text\u00a0\u00bb: \u00ab\u00a0Yes. This building was engineered for three 25-ton crane systems, and the video shows its heavy crane beams. Crane loads are part of the structural engineering, so share your crane specs with your building specialist early.\u00a0\u00bb}}, {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Question\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0Who erected the building?\u00a0\u00bb, \u00ab\u00a0acceptedAnswer\u00a0\u00bb: {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Answer\u00a0\u00bb, \u00ab\u00a0text\u00a0\u00bb: \u00ab\u00a0Nuvocon Ltd. erected the steel. Toro designs, engineers, manufactures and delivers the building, and doesn&rsquo;t install buildings itself. Large industrial projects like this one are usually put up by an experienced erection contractor.\u00a0\u00bb}}, {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Question\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0What roof system does the building use?\u00a0\u00bb, \u00ab\u00a0acceptedAnswer\u00a0\u00bb: {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Answer\u00a0\u00bb, \u00ab\u00a0text\u00a0\u00bb: \u00ab\u00a0According to Jeff, it uses an RTS roof system, which is a sandwich-panel roof system.\u00a0\u00bb}}, {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Question\u00a0\u00bb, \u00ab\u00a0name\u00a0\u00bb: \u00ab\u00a0Does Toro supply the foundation?\u00a0\u00bb, \u00ab\u00a0acceptedAnswer\u00a0\u00bb: {\u00ab\u00a0@type\u00a0\u00bb: \u00ab\u00a0Answer\u00a0\u00bb, \u00ab\u00a0text\u00a0\u00bb: \u00ab\u00a0No. Toro provides the structural reactions for every building so a local contractor can build the foundation to spec. You also get engineer-stamped drawings for your location to use for your building permit.\u00a0\u00bb}}]}[\/tcb-script][tcb-script]\/* Full-bleed: stretch the block edge to edge even inside a boxed Thrive section *\/(function(){  var el=document.getElementById(&lsquo;tvp1&rsquo;); if(!el) return;  function fit(){    el.style.setProperty(&lsquo;margin-left&rsquo;,&rsquo;0px&rsquo;,&rsquo;important&rsquo;);    el.style.setProperty(&lsquo;margin-right&rsquo;,&rsquo;0px&rsquo;,&rsquo;important&rsquo;);    el.style.setProperty(&lsquo;width&rsquo;,&rsquo;auto&rsquo;,&rsquo;important&rsquo;);    var vw=document.documentElement.clientWidth, left=el.getBoundingClientRect().left;    el.style.setProperty(&lsquo;width&rsquo;,vw+&rsquo;px&rsquo;,&rsquo;important&rsquo;);    el.style.setProperty(&lsquo;max-width&rsquo;,vw+&rsquo;px&rsquo;,&rsquo;important&rsquo;);    el.style.setProperty(&lsquo;margin-left&rsquo;,(-left)+&rsquo;px&rsquo;,&rsquo;important&rsquo;);  }  fit(); window.addEventListener(&lsquo;resize&rsquo;,fit); window.addEventListener(&lsquo;load&rsquo;,fit);  if(document.fonts&amp;&amp;document.fonts.ready) document.fonts.ready.then(fit);})();[\/tcb-script]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Watch a 200&#215;525 industrial steel building go up for a 105,000 sq ft precast plant: 72 truckloads of steel, heavy crane beams and key moments.<\/p>\n","protected":false},"featured_media":81450,"template":"","video_category":[3754,3755],"class_list":["post-78500","video_library","type-video_library","status-publish","has-post-thumbnail","hentry","post-wrapper","thrv_wrapper"],"_links":{"self":[{"href":"https:\/\/torosteelbuildings.com\/fr\/wp-json\/wp\/v2\/videos\/78500","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/torosteelbuildings.com\/fr\/wp-json\/wp\/v2\/videos"}],"about":[{"href":"https:\/\/torosteelbuildings.com\/fr\/wp-json\/wp\/v2\/types\/video_library"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/torosteelbuildings.com\/fr\/wp-json\/wp\/v2\/media\/81450"}],"wp:attachment":[{"href":"https:\/\/torosteelbuildings.com\/fr\/wp-json\/wp\/v2\/media?parent=78500"}],"wp:term":[{"taxonomy":"video_category","embeddable":true,"href":"https:\/\/torosteelbuildings.com\/fr\/wp-json\/wp\/v2\/video_category?post=78500"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}