{"id":74336,"date":"2026-10-13T15:07:20","date_gmt":"2026-10-13T19:07:20","guid":{"rendered":"https:\/\/torosteelbuildings.com\/?post_type=video_library&#038;p=74336"},"modified":"2026-11-12T08:09:57","modified_gmt":"2026-11-12T13:09:57","slug":"60x80x20-steel-building-frame-assembly-video","status":"publish","type":"video_library","link":"https:\/\/torosteelbuildings.com\/fr\/video-library\/60x80x20-steel-building-frame-assembly-video\/","title":{"rendered":"60x80x20 Steel Building Skeleton: 4-Day Assembly | Toro Steel Buildings"},"content":{"rendered":"<p><b>60x80x20<\/b><span>Steel building, in feet<\/span><b>4,800<\/b><span>Square feet<\/span><b>4 days<\/b><span>To put up the frame<\/span><\/p>\n<h2>About this video: a 60x80x20 steel building frame assembled in 4 days<\/h2>\n<p>In this 1:15 video, the steel frame of a 60x80x20 Toro building goes up in Ontario in 4 days. With no wall or roof panels on yet, you can see the clear-span frame of columns, rafters and secondary steel take shape day by day.<\/p>\n<p>It&rsquo;s a Toro <a href=\"\/options-and-finishes\/straight-wall-buildings\/\">straight-wall steel building<\/a>, the kind used for <a href=\"\/steel-building-types\/warehouses\/\">warehouses<\/a>, <a href=\"\/steel-building-types\/workshops\/\">workshops<\/a> and <a href=\"\/steel-building-types\/storage\/\">storage<\/a>. Toro doesn&rsquo;t install buildings: every kit is engineered for bolt-together assembly.<\/p>\n<ul aria-label=\"What the video shows\">\n<li><b>Day 2: the first frames.<\/b> A telehandler and lift raise the first columns and rafters.<\/li>\n<li><b>Day 3: the skeleton.<\/b> The main frames stand, with a scissor lift working inside.<\/li>\n<li><b>Day 4: the full frame.<\/b> The complete clear-span skeleton, ready for panels.<\/li>\n<\/ul>\n<h3>Video details<\/h3>\n<p>Length1:15PublishedOctober 19, 2022Channel<a href=\"https:\/\/www.youtube.com\/@ToroSteelBuildings\" target=\"_blank\" rel=\"noopener\">Toro Steel Buildings<\/a>Building60x80x20 steel building frameLocationOntario, CanadaTopicsAssembly time-lapse, warehouses<a href=\"https:\/\/www.youtube.com\/watch?v=1-QZjg6qSHQ\" target=\"_blank\" rel=\"noopener\">Watch on YouTube<\/a><\/p>\n<h2>Key moments in the video<\/h2>\n<p>Jump to any part of the 1:15 video on <a href=\"https:\/\/www.youtube.com\/watch?v=1-QZjg6qSHQ\" target=\"_blank\" rel=\"noopener\">YouTube<\/a>.<\/p>\n<ol>\n<li>0:01<span><a href=\"https:\/\/www.youtube.com\/watch?v=1-QZjg6qSHQ&amp;t=1s\" target=\"_blank\" rel=\"noopener\"><b>The first frames go up<\/b><\/a><span>A telehandler and lift raise the first columns and rafters.<\/span><\/span><\/li>\n<li>0:37<span><a href=\"https:\/\/www.youtube.com\/watch?v=1-QZjg6qSHQ&amp;t=37s\" target=\"_blank\" rel=\"noopener\"><b>Day 3: the skeleton takes shape<\/b><\/a><span>The main frames are up, with a scissor lift working inside.<\/span><\/span><\/li>\n<li>0:56<span><a href=\"https:\/\/www.youtube.com\/watch?v=1-QZjg6qSHQ&amp;t=56s\" target=\"_blank\" rel=\"noopener\"><b>Day 4: the full frame<\/b><\/a><span>The complete steel skeleton stands, ready for wall and roof panels.<\/span><\/span><\/li>\n<\/ol>\n<p>What&rsquo;s on screen (this video has no narration)<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=1-QZjg6qSHQ&amp;t=19s\" target=\"_blank\" rel=\"noopener\">0:19<\/a> Day 2: a telehandler lifts a rafter while a lift raises crew to the columns. On screen: \u00ab\u00a0Toro 60 x 80 x 20, ON, Canada\u00a0\u00bb.<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=1-QZjg6qSHQ&amp;t=37s\" target=\"_blank\" rel=\"noopener\">0:37<\/a> Day 3: the main frames stand, with a scissor lift inside.<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=1-QZjg6qSHQ&amp;t=56s\" target=\"_blank\" rel=\"noopener\">0:56<\/a> Day 4: the full frame, including the end walls.<\/p>\n<p>This video is set to music with no narration. These notes describe what appears on screen at each point.<\/p>\n<h2>The building in this video<\/h2>\n<p>A 60x80x20 Toro steel building frame, 4,800 sq ft, assembled in Ontario in 4 days.<\/p>\n<p>From 0:19<\/p>\n<h3>Raising the frames<\/h3>\n<p><span>Day 2<\/span><\/p>\n<p>A telehandler lifts the rafters into place while a crew in a lift connects them to the columns.<\/p>\n<p>From 0:56<\/p>\n<h3>The full skeleton<\/h3>\n<p><span>Day 4<\/span><\/p>\n<p>By day 4, the complete clear-span frame stands, including the end walls, ready for the wall and roof panels.<\/p>\n<p><img data-opt-id=1723161719  fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/i.ytimg.com\/vi\/1-QZjg6qSHQ\/hq2.jpg\" alt=\"The steel frame of a 60x80x20 building on day 3, with red-brown columns and rafters and a green scissor lift inside\" width=\"480\" height=\"360\" loading=\"lazy\" title=\"\">Day 3 of the 60x80x20 frame<\/p>\n<p>Every Toro building is engineered in-house for your site&rsquo;s snow, wind and seismic loads and comes with engineer-stamped drawings. Buildings are made in 30+ manufacturing facilities certified to standards including CSA A660, CWB, AISC and AWS D1.1. Engineering is led by <a href=\"\/about\/noah-sinclair\/\">Noah Sinclair, our in-house structural engineer<\/a>.<\/p>\n<h2>Questions about large steel building frames<\/h2>\n<p>Still unsure? <a href=\"\/price-my-building\/\">Price your building<\/a> and a building specialist will walk you through it.<\/p>\n<p>How long did this frame take to put up?<\/p>\n<p>The steel frame went up in 4 days.<\/p>\n<p>How big is a 60x80x20 steel building?<\/p>\n<p>It&rsquo;s 60 ft wide, 80 ft long and 20 ft high, or 4,800 sq ft.<\/p>\n<p>What does clear-span mean?<\/p>\n<p>A clear-span building has no interior columns, so the floor is open from wall to wall for equipment, storage or work areas.<\/p>\n<p>Does Toro supply the foundation?<\/p>\n<p>No. Toro provides the structural reactions for every building, so a local contractor can build the foundation to spec. Anchor bolts are included with cold-formed buildings and are an add-on for arch and red iron buildings.<\/p>\n<p>Does Toro install the building?<\/p>\n<p>No. Toro doesn&rsquo;t install buildings. Every kit is engineered for bolt-together assembly by the customer or a local contractor.<\/p>\n<p>How much does a 60&#215;80 steel building cost?<\/p>\n<p>Toro steel building kits start at $19 USD per sq ft in the U.S. and $26 CAD per sq ft in Canada. Your site&rsquo;s loads and codes, along with size, framing system, openings and options, have a big impact on the final price, so reach out for pricing on your specific building.<\/p>\n<h2>Related videos<\/h2>\n<p><a href=\"\/video-library\/whitehorse-commercial-steel-building-time-lapse-assembly\/\"><b>Whitehorse time-lapse<\/b><span>A 58x110x18 in the Yukon<\/span><\/a><a href=\"\/video-library\/35x70-steel-building-time-lapse-assembly\/\"><b>35&#215;70 time-lapse<\/b><span>A steel building in 10 days<\/span><\/a><a href=\"\/video-library\/future-buildings-diy-steel-kit-time-lapse-video\/\"><b>40&#215;60 kit time-lapse<\/b><span>A blue 40&#215;60 going up<\/span><\/a><a href=\"\/video-library\/200x525-industrial-steel-building\/\"><b>200&#215;525 industrial building<\/b><span>A precast facility build<\/span><\/a><\/p>\n<p>Browse every video in the <a href=\"\/resources\/video-library\/\">Toro video library<\/a>, read more <a href=\"\/about\/testimonials\/\">customer testimonials<\/a>, or see Toro&rsquo;s <a href=\"\/options-and-finishes\/straight-wall-buildings\/\">straight-wall buildings<\/a>, <a href=\"\/steel-building-types\/warehouses\/\">warehouses<\/a> and <a href=\"\/steel-building-sizes\/\">steel building sizes<\/a>.<\/p>\n<p>[tcb-script](function(){ var el=document.getElementById(&lsquo;tvd2&rsquo;); if(!el) return; function fit(){ el.style.setProperty(&lsquo;margin-left&rsquo;,&rsquo;0px&rsquo;,&rsquo;important&rsquo;); el.style.setProperty(&lsquo;margin-right&rsquo;,&rsquo;0px&rsquo;,&rsquo;important&rsquo;); el.style.setProperty(&lsquo;width&rsquo;,&rsquo;auto&rsquo;,&rsquo;important&rsquo;); var vw=document.documentElement.clientWidth, left=el.getBoundingClientRect().left; el.style.setProperty(&lsquo;width&rsquo;,vw+&rsquo;px&rsquo;,&rsquo;important&rsquo;); el.style.setProperty(&lsquo;max-width&rsquo;,vw+&rsquo;px&rsquo;,&rsquo;important&rsquo;); el.style.setProperty(&lsquo;margin-left&rsquo;,(-left)+&rsquo;px&rsquo;,&rsquo;important&rsquo;); } fit(); window.addEventListener(&lsquo;resize&rsquo;,fit); window.addEventListener(&lsquo;load&rsquo;,fit); if(document.fonts&amp;&amp;document.fonts.ready) document.fonts.ready.then(fit); })();[\/tcb-script]<\/p>\n","protected":false},"featured_media":81948,"template":"","video_category":[3757,3755],"class_list":["post-74336","video_library","type-video_library","status-publish","has-post-thumbnail","hentry","post-wrapper","thrv_wrapper"],"_links":{"self":[{"href":"https:\/\/torosteelbuildings.com\/fr\/wp-json\/wp\/v2\/videos\/74336","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/torosteelbuildings.com\/fr\/wp-json\/wp\/v2\/videos"}],"about":[{"href":"https:\/\/torosteelbuildings.com\/fr\/wp-json\/wp\/v2\/types\/video_library"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/torosteelbuildings.com\/fr\/wp-json\/wp\/v2\/media\/81948"}],"wp:attachment":[{"href":"https:\/\/torosteelbuildings.com\/fr\/wp-json\/wp\/v2\/media?parent=74336"}],"wp:term":[{"taxonomy":"video_category","embeddable":true,"href":"https:\/\/torosteelbuildings.com\/fr\/wp-json\/wp\/v2\/video_category?post=74336"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}