{"id":78498,"date":"2026-10-15T12:11:12","date_gmt":"2026-10-15T16:11:12","guid":{"rendered":"https:\/\/torosteelbuildings.com\/?post_type=video_library&#038;p=78498"},"modified":"2026-11-12T08:13:42","modified_gmt":"2026-11-12T13:13:42","slug":"200x525-precast-facility-construction-update","status":"publish","type":"video_library","link":"https:\/\/torosteelbuildings.com\/es\/video-library\/200x525-precast-facility-construction-update\/","title":{"rendered":"UPDATE: 200&#8217;x525&#8242; Precast Facility Construction | Toro Steel Buildings"},"content":{"rendered":"<h2>About this video: a construction update on a 200&#215;525 precast facility<\/h2>\n<p>In this 1:34 video, Jeff Langner of Nuvocon gives a construction update on the 200&#215;525 Toro steel building going up for a precast concrete facility in Bradford, Ontario. Despite weather delays over the summer, the steel is fully erected, and he walks through the plan for cladding, insulation and the roof.<\/p>\n<p>The building is one of Toro&#8217;s large <a href=\"\/steel-building-types\/manufacturing-facilities\/\">manufacturing facilities<\/a>, engineered by <a href=\"\/about\/engineering\/\">Toro&#8217;s engineering team<\/a>. See more <a href=\"\/steel-building-types\/commercial\/\">commercial buildings<\/a>. Toro doesn&#8217;t install buildings: this one was erected by Nuvocon.<\/p>\n<ul aria-label=\"What the video shows\">\n<li><b>All the steel is up.<\/b> Despite summer weather delays, the steel frame is fully erected.<\/li>\n<li><b>Cladding and insulation next.<\/b> The crew starts on the exterior walls and insulation, then the roof.<\/li>\n<li><b>Operational by spring.<\/b> He hopes to finish by the end of November and have the plant running the following spring.<\/li>\n<\/ul>\n<h3>Video details<\/h3>\n<p>Length1:34PublishedOctober 8, 2021Channel<a href=\"https:\/\/www.youtube.com\/@ToroSteelBuildings\" target=\"_blank\" rel=\"noopener\">Toro Steel Buildings<\/a>FeaturingJeff Langner, NuvoconBuilding200x525 precast facilityLocationBradford, OntarioTopicsIndustrial buildings, construction update<a href=\"https:\/\/www.youtube.com\/watch?v=Fyn9LD83YW4\" target=\"_blank\" rel=\"noopener\">Watch on YouTube<\/a><\/p>\n<h2>Key moments in the video<\/h2>\n<p>Jump to any part of the 1:34 video on <a href=\"https:\/\/www.youtube.com\/watch?v=Fyn9LD83YW4\" target=\"_blank\" rel=\"noopener\">YouTube<\/a>.<\/p>\n<ol>\n<li>0:15<span><a href=\"https:\/\/www.youtube.com\/watch?v=Fyn9LD83YW4&amp;t=15s\" target=\"_blank\" rel=\"noopener\"><b>Back at the 200&#215;525 build<\/b><\/a><span>Jeff Langner returns with an update on the Toro steel building his crew is erecting.<\/span><\/span><\/li>\n<li>0:27<span><a href=\"https:\/\/www.youtube.com\/watch?v=Fyn9LD83YW4&amp;t=27s\" target=\"_blank\" rel=\"noopener\"><b>A plant for precast panels<\/b><\/a><span>The building will produce tilt-up precast concrete panels and concrete components for multi-storey buildings.<\/span><\/span><\/li>\n<li>0:50<span><a href=\"https:\/\/www.youtube.com\/watch?v=Fyn9LD83YW4&amp;t=50s\" target=\"_blank\" rel=\"noopener\"><b>Weather delays and next steps<\/b><\/a><span>The steel is fully erected despite weather delays, and cladding and insulation start next.<\/span><\/span><\/li>\n<li>1:06<span><a href=\"https:\/\/www.youtube.com\/watch?v=Fyn9LD83YW4&amp;t=66s\" target=\"_blank\" rel=\"noopener\"><b>Done by November, running by spring<\/b><\/a><span>He hopes to finish by the end of November, with the plant operational the following spring.<\/span><\/span><\/li>\n<\/ol>\n<p>Read the video transcript<\/p>\n<p>Back at the 200&#215;525 build<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=Fyn9LD83YW4&amp;t=15s\" target=\"_blank\" rel=\"noopener\">0:15<\/a> Hi, Jeff Langner here with Nuvocon Limited. We&#8217;re erecting a Toro steel building.<\/p>\n<p>A plant for precast panels<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=Fyn9LD83YW4&amp;t=27s\" target=\"_blank\" rel=\"noopener\">0:27<\/a> As previously said, it&#8217;s 200 wide by 525 feet long. Again, it&#8217;s going to produce precast tilt-up concrete panels, as well as use a European technology of concrete columns, rafters and beams to do multi-storey concrete buildings.<\/p>\n<p>Weather delays and next steps<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=Fyn9LD83YW4&amp;t=50s\" target=\"_blank\" rel=\"noopener\">0:50<\/a> We&#8217;ve had a lot of delays with the weather this summer, which has put us behind, but we&#8217;ve currently got all the steel fully erected. We&#8217;re going to start cladding the exterior walls this week and insulating them, followed by starting the roof next week.<\/p>\n<p>Done by November, running by spring<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=Fyn9LD83YW4&amp;t=66s\" target=\"_blank\" rel=\"noopener\">1:06<\/a> Hopefully by the end of November, weather permitting, we&#8217;ll be done and out of here, and with a little bit of luck, this place will be commissioned and operational by next spring.<\/p>\n<p>Transcript lightly edited for readability. Music-only sections are left out.<\/p>\n<h2>The building in this video<\/h2>\n<p>A 200&#215;525 Toro steel building for a precast concrete facility in Bradford, Ontario, shown with its steel fully erected.<\/p>\n<p>From 0:27<\/p>\n<h3>A precast production plant<\/h3>\n<p><span>What the building is for<\/span><\/p>\n<p>The building will produce tilt-up precast concrete panels, along with concrete columns, rafters and beams for multi-storey buildings using a European technology.<\/p>\n<blockquote><p>\u201cIt&#8217;s going to produce precast tilt-up concrete panels.\u201d<\/p><\/blockquote>\n<p>From 0:50<\/p>\n<h3>Steel fully erected<\/h3>\n<p><span>Construction progress<\/span><\/p>\n<p>Weather delays over the summer put the project behind, but the steel frame is fully up. Cladding and insulation of the exterior walls start next, followed by the roof.<\/p>\n<blockquote><p>\u201cWe&#8217;ve currently got all the steel fully erected.\u201d<\/p><\/blockquote>\n<blockquote><p>\u201cWith a little bit of luck, this place will be commissioned and operational by next spring.\u201d<\/p><\/blockquote>\n<p>Jeff Langner, Nuvocon, at 1:06 in the video<img data-opt-id=1749031665  fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/i.ytimg.com\/vi\/Fyn9LD83YW4\/maxresdefault.jpg\" alt=\"Aerial view of the 200x525 precast facility steel frame fully erected, with roof purlins in place and building materials on the ground, captioned Precast Facility, Bradford, ON\" width=\"1280\" height=\"720\" loading=\"lazy\" title=\"\">The precast facility in Bradford, Ontario<\/p>\n<p>Every Toro building is engineered in-house for your site&#8217;s snow, wind and seismic loads and comes with engineer-stamped drawings. Buildings are made in 30+ manufacturing facilities certified to standards including CSA A660, CWB, AISC and AWS D1.1. Engineering is led by <a href=\"\/about\/noah-sinclair\/\">Noah Sinclair, our in-house structural engineer<\/a>.<\/p>\n<h2>Questions about large industrial steel buildings<\/h2>\n<p>Still unsure? <a href=\"\/price-my-building\/\">Price your building<\/a> and a building specialist will walk you through it.<\/p>\n<p>How big is the precast facility?<\/p>\n<p>The building is 200 feet wide by 525 feet long, or 105,000 sq ft.<\/p>\n<p>What will the building be used for?<\/p>\n<p>Jeff Langner says it will produce tilt-up precast concrete panels, along with concrete columns, rafters and beams for multi-storey buildings using a European technology.<\/p>\n<p>Does weather affect steel building construction?<\/p>\n<p>It can. This project had weather delays over the summer, but the crew had all the steel erected by the time of this update. Plan your schedule with some allowance for weather.<\/p>\n<p>Who erected the building?<\/p>\n<p>Nuvocon erected this building. Toro doesn&#8217;t install buildings. Every kit is engineered for bolt-together assembly by the customer or a contractor they choose.<\/p>\n<p>How long does delivery take?<\/p>\n<p>Delivery usually takes 2 to 8 weeks. Your building specialist will confirm the timing for your order, and you&#8217;ll need to arrange unloading when the kit arrives.<\/p>\n<p>How much does an industrial steel building cost?<\/p>\n<p>Toro steel building kits start at $19 USD per sq ft in the U.S. and $26 CAD per sq ft in Canada. Your site&#8217;s loads and codes, along with size, framing system, openings and options, have a big impact on the final price, so reach out for pricing on your specific building.<\/p>\n<h2>Related videos<\/h2>\n<p><a href=\"\/video-library\/200x525-industrial-steel-building\/\"><b>200&#215;525 industrial building<\/b><span>The same build, two weeks in<\/span><\/a><a href=\"\/video-library\/toro-steel-buildings-review-modular-precast\/\"><b>Modular Precast review<\/b><span>A CEO on his 200&#215;525 building<\/span><\/a><a href=\"\/video-library\/commercial-construction-200-x-525-steel-manufacturing-complex\/\"><b>200&#215;525 manufacturing complex<\/b><span>Commercial construction video<\/span><\/a><a href=\"\/video-library\/150x300x27-industrial-steel-building-review\/\"><b>150x300x27 warehouse review<\/b><span>Another industrial customer<\/span><\/a><\/p>\n<p>Browse every video in the <a href=\"\/resources\/video-library\/\">Toro video library<\/a>, read more <a href=\"\/about\/testimonials\/\">customer testimonials<\/a>, or see Toro&#8217;s <a href=\"\/steel-building-types\/manufacturing-facilities\/\">manufacturing facilities<\/a>, <a href=\"\/steel-building-types\/warehouses\/\">warehouses<\/a> and <a href=\"\/steel-building-types\/commercial\/\">commercial buildings<\/a>.<\/p>\n<p>[tcb-script](function(){ var el=document.getElementById(&#8216;tvd2&#8217;); if(!el) return; function fit(){ el.style.setProperty(&#8216;margin-left&#8217;,&#8217;0px&#8217;,&#8217;important&#8217;); el.style.setProperty(&#8216;margin-right&#8217;,&#8217;0px&#8217;,&#8217;important&#8217;); el.style.setProperty(&#8216;width&#8217;,&#8217;auto&#8217;,&#8217;important&#8217;); var vw=document.documentElement.clientWidth, left=el.getBoundingClientRect().left; el.style.setProperty(&#8216;width&#8217;,vw+&#8217;px&#8217;,&#8217;important&#8217;); el.style.setProperty(&#8216;max-width&#8217;,vw+&#8217;px&#8217;,&#8217;important&#8217;); el.style.setProperty(&#8216;margin-left&#8217;,(-left)+&#8217;px&#8217;,&#8217;important&#8217;); } fit(); window.addEventListener(&#8216;resize&#8217;,fit); window.addEventListener(&#8216;load&#8217;,fit); if(document.fonts&amp;&amp;document.fonts.ready) document.fonts.ready.then(fit); })();[\/tcb-script]<\/p>\n","protected":false},"featured_media":81990,"template":"","video_category":[3754,3755],"class_list":["post-78498","video_library","type-video_library","status-publish","has-post-thumbnail","hentry","post-wrapper","thrv_wrapper"],"_links":{"self":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/videos\/78498","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/videos"}],"about":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/types\/video_library"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/media\/81990"}],"wp:attachment":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/media?parent=78498"}],"wp:term":[{"taxonomy":"video_category","embeddable":true,"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/video_category?post=78498"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}