{"id":74225,"date":"2026-10-13T10:30:59","date_gmt":"2026-10-13T14:30:59","guid":{"rendered":"https:\/\/torosteelbuildings.com\/?post_type=video_library&#038;p=74225"},"modified":"2026-11-10T23:06:48","modified_gmt":"2026-11-11T04:06:48","slug":"35x70-steel-building-time-lapse-assembly","status":"publish","type":"video_library","link":"https:\/\/torosteelbuildings.com\/es\/video-library\/35x70-steel-building-time-lapse-assembly\/","title":{"rendered":"35&#215;70 Steel Building Time-Lapse: Winter Build in 10 Days | Toro Steel Buildings"},"content":{"rendered":"<p><b>35&#215;70<\/b><span>Steel building, in feet<\/span><b>2,450<\/b><span>Square feet<\/span><b>10 days<\/b><span>To erect, per the description<\/span><\/p>\n<h2>About this video: a 35&#215;70 steel building time-lapse in winter<\/h2>\n<p>In this 0:37 video, a 35&#215;70 Toro steel building is erected in a winter time-lapse, with day counters marking the progress as the steel frame goes up on a snow-covered site. The YouTube description says the building went up in 10 days.<\/p>\n<p>It&#8217;s a Toro <a href=\"\/options-and-finishes\/straight-wall-buildings\/\">straight-wall steel building<\/a>, a common choice for <a href=\"\/steel-building-types\/workshops\/\">workshops<\/a> and <a href=\"\/steel-building-types\/storage\/\">storage<\/a>. Toro doesn&#8217;t install buildings: every kit is engineered for bolt-together assembly.<\/p>\n<ul aria-label=\"What the video shows\">\n<li><b>Built in winter.<\/b> The steel frame goes up on a snow-covered site.<\/li>\n<li><b>Day by day.<\/b> On-screen counters mark day 4 and day 5 of the build.<\/li>\n<li><b>About 10 days.<\/b> The description says the building was erected in 10 days.<\/li>\n<\/ul>\n<h3>Video details<\/h3>\n<p>Length0:37PublishedFebruary 21, 2025Channel<a href=\"https:\/\/www.youtube.com\/@ToroSteelBuildings\" target=\"_blank\" rel=\"noopener\">Toro Steel Buildings<\/a>Building35x70 steel building, 2,450 sq ftTopicsTime-lapse, winter construction<a href=\"https:\/\/www.youtube.com\/watch?v=F1_ZFZWuH3Y\" target=\"_blank\" rel=\"noopener\">Watch on YouTube<\/a><\/p>\n<h2>Key moments in the video<\/h2>\n<p>Jump to any part of the 0:37 video on <a href=\"https:\/\/www.youtube.com\/watch?v=F1_ZFZWuH3Y\" target=\"_blank\" rel=\"noopener\">YouTube<\/a>.<\/p>\n<ol>\n<li>0:01<span><a href=\"https:\/\/www.youtube.com\/watch?v=F1_ZFZWuH3Y&amp;t=1s\" target=\"_blank\" rel=\"noopener\"><b>The frame goes up<\/b><\/a><span>Steel frames rise on a snow-covered site, with a lift working alongside.<\/span><\/span><\/li>\n<li>0:18<span><a href=\"https:\/\/www.youtube.com\/watch?v=F1_ZFZWuH3Y&amp;t=18s\" target=\"_blank\" rel=\"noopener\"><b>Day 5 and onward<\/b><\/a><span>The time-lapse continues from day 5 toward the finished building.<\/span><\/span><\/li>\n<\/ol>\n<p>What&#8217;s on screen (this video has no narration)<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=F1_ZFZWuH3Y&amp;t=9s\" target=\"_blank\" rel=\"noopener\">0:09<\/a> Day 4: steel frames stand on a snow-covered site, with a lift and a telehandler working.<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=F1_ZFZWuH3Y&amp;t=18s\" target=\"_blank\" rel=\"noopener\">0:18<\/a> Day 5: more frames are up.<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=F1_ZFZWuH3Y&amp;t=28s\" target=\"_blank\" rel=\"noopener\">0:28<\/a> A text graphic fills the screen.<\/p>\n<p>This video is set to music with no narration. These notes describe what appears on screen at each point.<\/p>\n<h2>The building in this video<\/h2>\n<p>A 35&#215;70 Toro straight-wall steel building, 2,450 sq ft, erected in winter.<\/p>\n<p>From 0:09<\/p>\n<h3>A winter build<\/h3>\n<p><span>Day 4<\/span><\/p>\n<p>By day 4, steel frames stand on the snow-covered site, with a lift and a telehandler working on the structure.<\/p>\n<p>From 0:18<\/p>\n<h3>About 10 days<\/h3>\n<p><span>Day 5 onward<\/span><\/p>\n<p>The day counter moves to day 5 as more of the frame goes up. The YouTube description says the whole building was erected in 10 days.<\/p>\n<p><img data-opt-id=1105043796  fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/i.ytimg.com\/vi\/F1_ZFZWuH3Y\/hq1.jpg\" alt=\"35x70 steel building time-lapse: steel frames standing on a snow-covered site, with a lift and a telehandler, and a Day 04 counter on screen\" width=\"480\" height=\"360\" loading=\"lazy\" title=\"\">Day 4 of the 35&#215;70 build<\/p>\n<p>Every Toro building is engineered in-house for your site&#8217;s snow, wind and seismic loads and comes with engineer-stamped drawings. Buildings are made in 30+ manufacturing facilities certified to standards including CSA A660, CWB, AISC and AWS D1.1. Engineering is led by <a href=\"\/about\/noah-sinclair\/\">Noah Sinclair, our in-house structural engineer<\/a>.<\/p>\n<h2>Questions about putting up a steel building<\/h2>\n<p>Still unsure? <a href=\"\/price-my-building\/\">Price your building<\/a> and a building specialist will walk you through it.<\/p>\n<p>How long does it take to put up a 35&#215;70 steel building?<\/p>\n<p>The YouTube description says this one was erected in 10 days. Your timing depends on the crew, equipment, weather and the building itself.<\/p>\n<p>Can you put up a steel building in winter?<\/p>\n<p>This one went up on a snow-covered site. Every Toro building is engineered for the snow, wind and seismic loads at its location.<\/p>\n<p>How big is a 35&#215;70 steel building?<\/p>\n<p>It&#8217;s 2,450 sq ft. Toro designs every building to the width, length and height you need.<\/p>\n<p>Does Toro install the building?<\/p>\n<p>No. Toro doesn&#8217;t install buildings. Every kit is engineered for bolt-together assembly by the customer or a local contractor.<\/p>\n<p>How long does delivery take?<\/p>\n<p>Delivery usually takes 2 to 8 weeks. Your building specialist will confirm the timing for your order, and you&#8217;ll need to arrange unloading when the kit arrives.<\/p>\n<p>How much does a 35&#215;70 steel building cost?<\/p>\n<p>Toro steel building kits start at $19 USD per sq ft in the U.S. and $26 CAD per sq ft in Canada. Your site&#8217;s loads and codes, along with size, framing system, openings and options, have a big impact on the final price, so reach out for pricing on your specific building.<\/p>\n<h2>Related videos<\/h2>\n<p><a href=\"\/video-library\/future-buildings-diy-steel-kit-time-lapse-video\/\"><b>40&#215;60 kit time-lapse<\/b><span>A blue 40&#215;60 going up<\/span><\/a><a href=\"\/video-library\/60x80x20-steel-building-frame-assembly-video\/\"><b>60x80x20 frame assembly<\/b><span>A big frame in four days<\/span><\/a><a href=\"\/video-library\/whitehorse-commercial-steel-building-time-lapse-assembly\/\"><b>Whitehorse time-lapse<\/b><span>A 58x110x18 in the Yukon<\/span><\/a><a href=\"\/video-library\/prefab-steel-building-construction-time-lapse-video\/\"><b>Construction time-lapse<\/b><span>Another building going up<\/span><\/a><\/p>\n<p>Browse every video in the <a href=\"\/resources\/video-library\/\">Toro video library<\/a>, read more <a href=\"\/about\/testimonials\/\">customer testimonials<\/a>, or see Toro&#8217;s <a href=\"\/steel-building-types\/workshops\/\">workshops<\/a>, <a href=\"\/steel-building-types\/storage\/\">storage buildings<\/a> and <a href=\"\/steel-building-sizes\/\">steel building sizes<\/a>.<\/p>\n<p>[tcb-script](function(){ var el=document.getElementById(&#8216;tvd2&#8217;); if(!el) return; function fit(){ el.style.setProperty(&#8216;margin-left&#8217;,&#8217;0px&#8217;,&#8217;important&#8217;); el.style.setProperty(&#8216;margin-right&#8217;,&#8217;0px&#8217;,&#8217;important&#8217;); el.style.setProperty(&#8216;width&#8217;,&#8217;auto&#8217;,&#8217;important&#8217;); var vw=document.documentElement.clientWidth, left=el.getBoundingClientRect().left; el.style.setProperty(&#8216;width&#8217;,vw+&#8217;px&#8217;,&#8217;important&#8217;); el.style.setProperty(&#8216;max-width&#8217;,vw+&#8217;px&#8217;,&#8217;important&#8217;); el.style.setProperty(&#8216;margin-left&#8217;,(-left)+&#8217;px&#8217;,&#8217;important&#8217;); } fit(); window.addEventListener(&#8216;resize&#8217;,fit); window.addEventListener(&#8216;load&#8217;,fit); if(document.fonts&amp;&amp;document.fonts.ready) document.fonts.ready.then(fit); })();[\/tcb-script]<\/p>\n","protected":false},"featured_media":82198,"template":"","video_category":[],"class_list":["post-74225","video_library","type-video_library","status-publish","has-post-thumbnail","hentry","post-wrapper","thrv_wrapper"],"_links":{"self":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/videos\/74225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/videos"}],"about":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/types\/video_library"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/media\/82198"}],"wp:attachment":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/media?parent=74225"}],"wp:term":[{"taxonomy":"video_category","embeddable":true,"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/video_category?post=74225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}