{"id":74094,"date":"2026-10-17T11:40:00","date_gmt":"2026-10-17T15:40:00","guid":{"rendered":"https:\/\/torosteelbuildings.com\/?post_type=video_library&#038;p=74094"},"modified":"2026-11-04T15:38:08","modified_gmt":"2026-11-04T20:38:08","slug":"toro-steel-buildings-review-modular-precast","status":"publish","type":"video_library","link":"https:\/\/torosteelbuildings.com\/es\/video-library\/toro-steel-buildings-review-modular-precast\/","title":{"rendered":"Toro Steel Buildings Review | CEO of Modular Precast on Large Industrial Facility Build"},"content":{"rendered":"<p><!-- TORO VIDEO WATCH PAGE \u00b7 \"Toro Steel Buildings Review | CEO of Modular Precast on Large Industrial Facility Build\"     Video: https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo \u00b7 4:35 (PT4M35S) \u00b7 published 2026-02-13 \u00b7 channel: Toro Steel Buildings \u00b7 WP post 74094     Same building as the 200x525 precast facility page (\/video-reviews\/200x525-industrial-steel-building\/).     Paste into ONE Thrive Custom HTML element. The template's H1 + YouTube iframe stay ABOVE this block (real iframe, no facade).     H1 and VideoObject name match the YouTube title word for word. Key moments = YouTube chapters.     No hard-coded phone numbers (the site uses a dynamic number). All CSS is scoped to .tvm1. -->  <span aria-hidden=\"true\"><\/span><span aria-hidden=\"true\"><\/span>  <!-- STAT BAR -->                    <b>200&#215;525<\/b><span>Feet wide by long<\/span>        <b>46<\/b><span>Feet high<\/span>        <b>20<\/b><span>Acre site<\/span>        <b>&lt;6<\/b><span>Months, design to completion<\/span>              <!-- ABOUT THIS VIDEO -->                    <span>Customer review \u00b7 Industrial facility<\/span><\/p>\n<h2>About this video: a Toro Steel Buildings review from the CEO of Modular Precast<\/h2>\n<p>In this Toro Steel Buildings review, Glen Pestrin, CEO of Modular Precast, talks about building his company&#8217;s 200&#215;525 industrial steel building north of Toronto, from the first meeting to a finished facility. He covers why steel was the only option for his timeline, how Toro planned around equipment from Germany, and what the build was like day to day.<\/p>\n<p>It&#8217;s the same building you can see going up in our <a href=\"\/video-reviews\/200x525-industrial-steel-building\/\">200&#215;525 precast facility video<\/a>. This time it&#8217;s finished, and the customer gives his verdict.<\/p>\n<ul aria-label=\"What the video shows\">\n<li><b>\u00abIt was the only solution.\u00bb<\/b> Conventional construction couldn&#8217;t meet Modular Precast&#8217;s time frame. The project went from design to completion in under six months.<\/li>\n<li><b>Planning before steel.<\/b> Budget, timeline and constructability were set in the first meeting, with barriers flagged early and a plan for each.<\/li>\n<li><b>\u00abThe IKEA of buildings.\u00bb<\/b> Clear drawings, a precise delivery schedule and assembly by piece count kept the build easy to follow.<\/li>\n<\/ul>\n<p>                    <span>Customer review<\/span><\/p>\n<h3>Video details<\/h3>\n<p>                  Length4:35          PublishedFebruary 13, 2026          Channel<a href=\"https:\/\/www.youtube.com\/@ToroSteelBuildings\" target=\"_blank\" rel=\"noopener\">Toro Steel Buildings<\/a>          FeaturingGlen Pestrin, CEO, Modular Precast          Building200x525x46 industrial          LocationNorth of Toronto, Ontario          TopicsCustomer review, planning, industrial build                <a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo\" target=\"_blank\" rel=\"noopener\">Watch on YouTube<\/a>              <!-- KEY MOMENTS + TRANSCRIPT -->            <span>Chapters<\/span><\/p>\n<h2>Key moments in the video<\/h2>\n<p>Each moment matches a chapter in the YouTube video. Select a time to jump to it on YouTube.<\/p>\n<ol>\n<li><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=0s\" target=\"_blank\" rel=\"noopener\">0:00<\/a><span><b>Why steel was the only solution<\/b><span>Glen Pestrin, CEO of Modular Precast, explains why conventional construction wouldn&#8217;t have met his timeline.<\/span><\/span><\/li>\n<li><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=46s\" target=\"_blank\" rel=\"noopener\">0:46<\/a><span><b>How Modular Precast found Toro<\/b><span>Word of mouth from friends, architects and engineers, and a portfolio of large, multinational projects.<\/span><\/span><\/li>\n<li><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=80s\" target=\"_blank\" rel=\"noopener\">1:20<\/a><span><b>The first sit-down<\/b><span>Budget, timeline and constructability, with barriers flagged early and a plan for each one.<\/span><\/span><\/li>\n<li><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=108s\" target=\"_blank\" rel=\"noopener\">1:48<\/a><span><b>Coordinating equipment from Germany<\/b><span>Toro worked with the overseas engineers so the specialized equipment would fit the space.<\/span><\/span><\/li>\n<li><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=145s\" target=\"_blank\" rel=\"noopener\">2:25<\/a><span><b>Beating expectations, with an envelope consultant<\/b><span>An independent envelope consultant suggested tweaks, and Toro made them.<\/span><\/span><\/li>\n<li><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=173s\" target=\"_blank\" rel=\"noopener\">2:53<\/a><span><b>A schedule you could set a stopwatch to<\/b><span>Trailer counts, crane positions, site layout and drawings for the site and footings.<\/span><\/span><\/li>\n<li><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=208s\" target=\"_blank\" rel=\"noopener\">3:28<\/a><span><b>\u00abThe IKEA of buildings\u00bb<\/b><span>Structure, siding, then roof, tracked by piece count so progress is easy to follow.<\/span><\/span><\/li>\n<li><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=241s\" target=\"_blank\" rel=\"noopener\">4:01<\/a><span><b>Would he recommend Toro?<\/b><span>Cost, speed, organization and quality, and a team that put the client&#8217;s success first.<\/span><\/span><\/li>\n<\/ol>\n<p>              Read the video transcript                  <!-- From YouTube captions. Music cues and filler words removed; names corrected from the on-screen caption. -->          <\/p>\n<h3>Why steel was the only solution<\/h3>\n<p>It was the only solution. Period. Full stop. Conventional construction would not have worked in the time frame that we needed it.<\/p>\n<p>My name is Glen Pestrin and I&#8217;m the CEO of Modular Precast. We&#8217;re sitting on 20 acres. Our building is approximately 110,000 square feet.<\/p>\n<h3>How Modular Precast found Toro<\/h3>\n<p>[We were] investigating various manufacturers. Toro&#8217;s name kept popping up, not only through references of friends but through architects and engineers. So, it was pretty well through word of mouth, I would say.<\/p>\n<p>When we finally had a chance to meet Toro face to face and review their portfolio, it was incredibly impressive. The size of buildings that they&#8217;ve done, the locations, multinational building, understanding building codes, and the ability to translate all those requirements to a final product was really impressive in their portfolio.<\/p>\n<h3>The first sit-down<\/h3>\n<p>The overall experience was excellent. And what I really enjoyed the most was that first sit down and the time that they took to understand my expectations on all levels: budget, timewise, constructibility. And they were very forthcoming with any barriers that they could have encountered, and they already had a plan in place on how to deal with them. So that really was sort of the icing on the cake for us.<\/p>\n<h3>Coordinating equipment from Germany<\/h3>\n<p>We had very specific equipment requirements coming in from Germany, and Toro coordinated with the overseas engineers to ensure that everything would fit within the space.<\/p>\n<p>And again, having that first meeting together, setting all those expectations, it didn&#8217;t really start off as a venture. It was more like a bunch of guys getting together at a pub for a beer. And that same energy kept going. Yeah, there were problems, there were tense moments. Everybody kept coming back to the table for a solution, and I think it&#8217;s because the intention was there to give us a quality product.<\/p>\n<h3>Beating expectations<\/h3>\n<p>No, they exceeded expectations: timeline, product, delivery. I cannot believe how open they were. We actually brought an envelope consultant in to make sure we had designed things properly. They were very open to understanding our needs and to constructive criticism. There were some areas where the consultant pointed out a few little tweaks that needed to be done. Toro was there, no questions asked, and got it done because they knew it was a better way to build.<\/p>\n<h3>Schedules, site plans and drawings<\/h3>\n<p>The date they gave us, you could have set your stopwatch on it. They told us how many trailers were going to set up in a day, where their cranes were going to be. They even put an X on where their job shack and office was going to be and made sure they cleared it with us. [They] gave me a laid-out drawing of what members were going to go where, where all the miscellaneous equipment was going to go, their crane, their forklifts. It was excellent.<\/p>\n<p>The drawings are absolutely crystal clear, that any layman can pick up and understand them. They were very clear on the drawings that they gave us to prepare the site and the footings. Clear, concise, and this clear, logical process was followed all the way through.<\/p>\n<h3>The IKEA of buildings<\/h3>\n<p>It&#8217;s really simple. Structure goes up, siding goes up, roof goes up, and it&#8217;s a real simple thing to follow. Open book, you can see how fast production is going. They have an assembly by piece count. It&#8217;s like the IKEA of buildings. If you know, you&#8217;ll know there&#8217;s a problem right away. There&#8217;s no black magic in this. It&#8217;s super, super simple and easy.<\/p>\n<h3>Would he recommend Toro?<\/h3>\n<p>Extremely satisfied with our Toro building. I would recommend Toro. As I said before, cost, speed, organization and quality, it&#8217;s all there. It&#8217;s all there. And having that team effort and putting your interpretations of success before theirs is what really differentiates them.<\/p>\n<p>                      <!-- THE FIVE STAGES -->            <span>The Toro process<\/span><\/p>\n<h2>The five stages, as Modular Precast saw them<\/h2>\n<p>Glen&#8217;s review touches every stage of the build, from the first meeting to the roof going on.<\/p>\n<ol>\n<li><span>1<\/span><br \/>\n<h3>Design<\/h3>\n<p><span>Toro \u00b7 in this video<\/span><\/p>\n<p>A first sit-down on budget, timeline and constructability, with barriers planned for up front.<\/p>\n<\/li>\n<li><span>2<\/span><br \/>\n<h3>Engineer<\/h3>\n<p><span>Toro \u00b7 in this video<\/span><\/p>\n<p>Coordinated with overseas engineers so equipment from Germany would fit, and reviewed by an envelope consultant.<\/p>\n<\/li>\n<li><span>3<\/span><br \/>\n<h3>Manufacture<\/h3>\n<p><span>Toro<\/span><\/p>\n<p>Cut, drilled and labeled in our 30+ facilities, so assembly can follow a piece count.<\/p>\n<\/li>\n<li><span>4<\/span><br \/>\n<h3>Deliver<\/h3>\n<p><span>Toro \u00b7 in this video<\/span><\/p>\n<p>A delivery date \u00abyou could have set your stopwatch on,\u00bb with trailer counts and a site layout plan.<\/p>\n<\/li>\n<li><span>5<\/span><br \/>\n<h3>Assemble<\/h3>\n<p><span>Erection crew \u00b7 in this video<\/span><\/p>\n<p>Structure, siding, then roof. Nuvocon Ltd. erected the steel on this project.<\/p>\n<\/li>\n<\/ol>\n<p>      <!-- IMAGE SLOTS 1\u20133: slot 1 = YouTube thumbnail (1280x720, also the share image). Slots 2\u20133 = YouTube auto-frames (480x360). -->              <!-- IMAGE SLOT 1 --><img data-opt-id=831668801  fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/i.ytimg.com\/vi\/g6qdJ4EhuSo\/maxresdefault.jpg\" alt=\"Aerial view of the finished 200x525x46 Modular Precast steel building with a &#039;CEO Review&#039; title\" width=\"1280\" height=\"720\" loading=\"lazy\" title=\"\">The finished facility        <!-- IMAGE SLOT 2 --><img data-opt-id=995807769  fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/i.ytimg.com\/vi\/g6qdJ4EhuSo\/hq1.jpg\" alt=\"Glen Pestrin, CEO of Modular Precast, outside the finished Toro steel building\" width=\"480\" height=\"360\" loading=\"lazy\" title=\"\">Glen Pestrin, CEO        <!-- IMAGE SLOT 3 --><img data-opt-id=125061124  decoding=\"async\" src=\"https:\/\/i.ytimg.com\/vi\/g6qdJ4EhuSo\/hq2.jpg\" alt=\"Glen Pestrin talking about his Toro steel building in front of its insulated wall panels\" width=\"480\" height=\"360\" loading=\"lazy\" title=\"\">On site at Modular Precast            <\/p>\n<p>Our facilities are certified to fabrication and welding standards including CSA A660, CWB, AISC and AWS D1.1. Engineering is led by <a href=\"\/about\/noah-sinclair\/\">Noah Sinclair, our in-house structural engineer<\/a>. New to steel buildings? Start with our <a href=\"\/blog\/pemb-guide\/\">pre-engineered metal building guide<\/a>.<\/p>\n<p>        <!-- FAQ -->                    <span>FAQ<\/span><\/p>\n<h2>Questions about the Modular Precast build<\/h2>\n<p>Planning an industrial building? <a href=\"\/price-my-building\/\">Price your building<\/a> and a building specialist will walk you through it.<\/p>\n<p>                    Which building is the CEO talking about?<\/p>\n<p>It&#8217;s the Modular Precast facility north of Toronto: a 200 ft by 525 ft by 46 ft Toro steel building on a 20-acre site, which Glen describes as approximately 110,000 square feet. You can watch it going up in our <a href=\"\/video-reviews\/200x525-industrial-steel-building\/\">200&#215;525 precast facility video<\/a>.<\/p>\n<p>        Why did Modular Precast choose a steel building?<\/p>\n<p>Speed. Glen says conventional construction wouldn&#8217;t have worked in the time frame they needed. According to the YouTube description, the project went from design concept to completion in under six months.<\/p>\n<p>        How did Modular Precast find Toro Steel Buildings?<\/p>\n<p>Mostly by word of mouth. Toro&#8217;s name kept coming up through friends, architects and engineers. After meeting the team and reviewing Toro&#8217;s portfolio of large, multinational projects, Modular Precast chose Toro.<\/p>\n<p>        Can Toro work around specialized equipment from overseas?<\/p>\n<p>Yes. Modular Precast had specific equipment requirements coming from Germany, and Toro coordinated with the overseas engineers to make sure everything would fit within the building.<\/p>\n<p>        What were the drawings and site plans like?<\/p>\n<p>Glen calls them crystal clear. Toro&#8217;s drawings showed how to prepare the site and the footings, and a layout drawing showed where each member, the cranes, the forklifts and the job site office would go.<\/p>\n<p>        Does Toro supply the foundation?<\/p>\n<p>No. Toro provides the structural reactions and clear drawings so a local contractor can build the site and footings to spec. You also get engineer-stamped drawings for your location to use for your building permit.<\/p>\n<p>        Would the CEO recommend Toro Steel Buildings?<\/p>\n<p>Yes. Glen says he&#8217;s extremely satisfied and would recommend Toro for cost, speed, organization and quality.<\/p>\n<p>            <!-- SCHEMA: VideoObject (key moments + transcript) and FAQPage. Rank Math's own video schema is removed on this post. -->[tcb-script type=\u00bbapplication\/ld+json\u00bb]{\u00ab@context\u00bb: \u00abhttps:\/\/schema.org\u00bb, \u00ab@type\u00bb: \u00abVideoObject\u00bb, \u00abname\u00bb: \u00abToro Steel Buildings Review | CEO of Modular Precast on Large Industrial Facility Build\u00bb, \u00abdescription\u00bb: \u00abGlen Pestrin, CEO of Modular Precast, reviews building his company&#8217;s 200x525x46 Toro industrial steel building north of Toronto: why steel was the only option for his timeline, coordinating equipment from Germany, clear drawings, a precise schedule and design to completion in under six months.\u00bb, \u00abuploadDate\u00bb: \u00ab2026-02-13T13:06:03-08:00\u00bb, \u00abduration\u00bb: \u00abPT4M35S\u00bb, \u00abisFamilyFriendly\u00bb: true, \u00abthumbnailUrl\u00bb: [\u00abhttps:\/\/i.ytimg.com\/vi\/g6qdJ4EhuSo\/maxresdefault.jpg\u00bb, \u00abhttps:\/\/i.ytimg.com\/vi\/g6qdJ4EhuSo\/hqdefault.jpg\u00bb], \u00abembedUrl\u00bb: \u00abhttps:\/\/www.youtube.com\/embed\/g6qdJ4EhuSo\u00bb, \u00aburl\u00bb: \u00abhttps:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo\u00bb, \u00abinLanguage\u00bb: \u00aben\u00bb, \u00abpublisher\u00bb: {\u00ab@type\u00bb: \u00abOrganization\u00bb, \u00abname\u00bb: \u00abToro Steel Buildings\u00bb, \u00aburl\u00bb: \u00abhttps:\/\/torosteelbuildings.com\u00bb}, \u00ababout\u00bb: [{\u00ab@type\u00bb: \u00abThing\u00bb, \u00abname\u00bb: \u00abToro Steel Buildings review\u00bb}, {\u00ab@type\u00bb: \u00abThing\u00bb, \u00abname\u00bb: \u00abIndustrial steel buildings\u00bb}, {\u00ab@type\u00bb: \u00abThing\u00bb, \u00abname\u00bb: \u00abPrecast concrete plant\u00bb}], \u00abmentions\u00bb: [{\u00ab@type\u00bb: \u00abOrganization\u00bb, \u00abname\u00bb: \u00abModular Precast\u00bb}, {\u00ab@type\u00bb: \u00abPerson\u00bb, \u00abname\u00bb: \u00abGlen Pestrin\u00bb, \u00abjobTitle\u00bb: \u00abCEO\u00bb, \u00abworksFor\u00bb: {\u00ab@type\u00bb: \u00abOrganization\u00bb, \u00abname\u00bb: \u00abModular Precast\u00bb}}], \u00abhasPart\u00bb: [{\u00ab@type\u00bb: \u00abClip\u00bb, \u00abname\u00bb: \u00abWhy steel was the only solution\u00bb, \u00abstartOffset\u00bb: 0, \u00abendOffset\u00bb: 46, \u00aburl\u00bb: \u00abhttps:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=0s\u00bb}, {\u00ab@type\u00bb: \u00abClip\u00bb, \u00abname\u00bb: \u00abHow Modular Precast found Toro\u00bb, \u00abstartOffset\u00bb: 46, \u00abendOffset\u00bb: 80, \u00aburl\u00bb: \u00abhttps:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=46s\u00bb}, {\u00ab@type\u00bb: \u00abClip\u00bb, \u00abname\u00bb: \u00abThe first sit-down\u00bb, \u00abstartOffset\u00bb: 80, \u00abendOffset\u00bb: 108, \u00aburl\u00bb: \u00abhttps:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=80s\u00bb}, {\u00ab@type\u00bb: \u00abClip\u00bb, \u00abname\u00bb: \u00abCoordinating equipment from Germany\u00bb, \u00abstartOffset\u00bb: 108, \u00abendOffset\u00bb: 145, \u00aburl\u00bb: \u00abhttps:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=108s\u00bb}, {\u00ab@type\u00bb: \u00abClip\u00bb, \u00abname\u00bb: \u00abBeating expectations, with an envelope consultant\u00bb, \u00abstartOffset\u00bb: 145, \u00abendOffset\u00bb: 173, \u00aburl\u00bb: \u00abhttps:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=145s\u00bb}, {\u00ab@type\u00bb: \u00abClip\u00bb, \u00abname\u00bb: \u00abA schedule you could set a stopwatch to\u00bb, \u00abstartOffset\u00bb: 173, \u00abendOffset\u00bb: 208, \u00aburl\u00bb: \u00abhttps:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=173s\u00bb}, {\u00ab@type\u00bb: \u00abClip\u00bb, \u00abname\u00bb: \u00abThe IKEA of buildings\u00bb, \u00abstartOffset\u00bb: 208, \u00abendOffset\u00bb: 241, \u00aburl\u00bb: \u00abhttps:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=208s\u00bb}, {\u00ab@type\u00bb: \u00abClip\u00bb, \u00abname\u00bb: \u00abWould he recommend Toro?\u00bb, \u00abstartOffset\u00bb: 241, \u00abendOffset\u00bb: 275, \u00aburl\u00bb: \u00abhttps:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=241s\u00bb}], \u00abtranscript\u00bb: \u00abIt was the only solution. Period. Full stop. Conventional construction would not have worked in the time frame that we needed it. My name is Glen Pestrin and I&#8217;m the CEO of Modular Precast. We&#8217;re sitting on 20 acres. Our building is approximately 110,000 square feet. [We were] investigating various manufacturers. Toro&#8217;s name kept popping up, not only through references of friends but through architects and engineers. So, it was pretty well through word of mouth, I would say. When we finally had a chance to meet Toro face to face and review their portfolio, it was incredibly impressive. The size of buildings that they&#8217;ve done, the locations, multinational building, understanding building codes, and the ability to translate all those requirements to a final product was really impressive in their portfolio. The overall experience was excellent. And what I really enjoyed the most was that first sit down and the time that they took to understand my expectations on all levels: budget, timewise, constructibility. And they were very forthcoming with any barriers that they could have encountered, and they already had a plan in place on how to deal with them. So that really was sort of the icing on the cake for us. We had very specific equipment requirements coming in from Germany, and Toro coordinated with the overseas engineers to ensure that everything would fit within the space. And again, having that first meeting together, setting all those expectations, it didn&#8217;t really start off as a venture. It was more like a bunch of guys getting together at a pub for a beer. And that same energy kept going. Yeah, there were problems, there were tense moments. Everybody kept coming back to the table for a solution, and I think it&#8217;s because the intention was there to give us a quality product. No, they exceeded expectations: timeline, product, delivery. I cannot believe how open they were. We actually brought an envelope consultant in to make sure we had designed things properly. They were very open to understanding our needs and to constructive criticism. There were some areas where the consultant pointed out a few little tweaks that needed to be done. Toro was there, no questions asked, and got it done because they knew it was a better way to build. The date they gave us, you could have set your stopwatch on it. They told us how many trailers were going to set up in a day, where their cranes were going to be. They even put an X on where their job shack and office was going to be and made sure they cleared it with us. [They] gave me a laid-out drawing of what members were going to go where, where all the miscellaneous equipment was going to go, their crane, their forklifts. It was excellent. The drawings are absolutely crystal clear, that any layman can pick up and understand them. They were very clear on the drawings that they gave us to prepare the site and the footings. Clear, concise, and this clear, logical process was followed all the way through. It&#8217;s really simple. Structure goes up, siding goes up, roof goes up, and it&#8217;s a real simple thing to follow. Open book, you can see how fast production is going. They have an assembly by piece count. It&#8217;s like the IKEA of buildings. If you know, you&#8217;ll know there&#8217;s a problem right away. There&#8217;s no black magic in this. It&#8217;s super, super simple and easy. Extremely satisfied with our Toro building. I would recommend Toro. As I said before, cost, speed, organization and quality, it&#8217;s all there. It&#8217;s all there. And having that team effort and putting your interpretations of success before theirs is what really differentiates them.\u00bb}[\/tcb-script][tcb-script type=\u00bbapplication\/ld+json\u00bb]{\u00ab@context\u00bb: \u00abhttps:\/\/schema.org\u00bb, \u00ab@type\u00bb: \u00abFAQPage\u00bb, \u00abmainEntity\u00bb: [{\u00ab@type\u00bb: \u00abQuestion\u00bb, \u00abname\u00bb: \u00abWhich building is the CEO talking about?\u00bb, \u00abacceptedAnswer\u00bb: {\u00ab@type\u00bb: \u00abAnswer\u00bb, \u00abtext\u00bb: \u00abIt&#8217;s the Modular Precast facility north of Toronto: a 200 ft by 525 ft by 46 ft Toro steel building on a 20-acre site, which Glen describes as approximately 110,000 square feet. You can watch it going up in our 200&#215;525 precast facility video.\u00bb}}, {\u00ab@type\u00bb: \u00abQuestion\u00bb, \u00abname\u00bb: \u00abWhy did Modular Precast choose a steel building?\u00bb, \u00abacceptedAnswer\u00bb: {\u00ab@type\u00bb: \u00abAnswer\u00bb, \u00abtext\u00bb: \u00abSpeed. Glen says conventional construction wouldn&#8217;t have worked in the time frame they needed. According to the YouTube description, the project went from design concept to completion in under six months.\u00bb}}, {\u00ab@type\u00bb: \u00abQuestion\u00bb, \u00abname\u00bb: \u00abHow did Modular Precast find Toro Steel Buildings?\u00bb, \u00abacceptedAnswer\u00bb: {\u00ab@type\u00bb: \u00abAnswer\u00bb, \u00abtext\u00bb: \u00abMostly by word of mouth. Toro&#8217;s name kept coming up through friends, architects and engineers. After meeting the team and reviewing Toro&#8217;s portfolio of large, multinational projects, Modular Precast chose Toro.\u00bb}}, {\u00ab@type\u00bb: \u00abQuestion\u00bb, \u00abname\u00bb: \u00abCan Toro work around specialized equipment from overseas?\u00bb, \u00abacceptedAnswer\u00bb: {\u00ab@type\u00bb: \u00abAnswer\u00bb, \u00abtext\u00bb: \u00abYes. Modular Precast had specific equipment requirements coming from Germany, and Toro coordinated with the overseas engineers to make sure everything would fit within the building.\u00bb}}, {\u00ab@type\u00bb: \u00abQuestion\u00bb, \u00abname\u00bb: \u00abWhat were the drawings and site plans like?\u00bb, \u00abacceptedAnswer\u00bb: {\u00ab@type\u00bb: \u00abAnswer\u00bb, \u00abtext\u00bb: \u00abGlen calls them crystal clear. Toro&#8217;s drawings showed how to prepare the site and the footings, and a layout drawing showed where each member, the cranes, the forklifts and the job site office would go.\u00bb}}, {\u00ab@type\u00bb: \u00abQuestion\u00bb, \u00abname\u00bb: \u00abDoes Toro supply the foundation?\u00bb, \u00abacceptedAnswer\u00bb: {\u00ab@type\u00bb: \u00abAnswer\u00bb, \u00abtext\u00bb: \u00abNo. Toro provides the structural reactions and clear drawings so a local contractor can build the site and footings to spec. You also get engineer-stamped drawings for your location to use for your building permit.\u00bb}}, {\u00ab@type\u00bb: \u00abQuestion\u00bb, \u00abname\u00bb: \u00abWould the CEO recommend Toro Steel Buildings?\u00bb, \u00abacceptedAnswer\u00bb: {\u00ab@type\u00bb: \u00abAnswer\u00bb, \u00abtext\u00bb: \u00abYes. Glen says he&#8217;s extremely satisfied and would recommend Toro for cost, speed, organization and quality.\u00bb}}]}[\/tcb-script][tcb-script]\/* Full-bleed: stretch the block edge to edge even inside a boxed Thrive section *\/(function(){  var el=document.getElementById(&#8216;tvm1&#8217;); if(!el) return;  function fit(){    el.style.setProperty(&#8216;margin-left&#8217;,&#8217;0px&#8217;,&#8217;important&#8217;);    el.style.setProperty(&#8216;margin-right&#8217;,&#8217;0px&#8217;,&#8217;important&#8217;);    el.style.setProperty(&#8216;width&#8217;,&#8217;auto&#8217;,&#8217;important&#8217;);    var vw=document.documentElement.clientWidth, left=el.getBoundingClientRect().left;    el.style.setProperty(&#8216;width&#8217;,vw+&#8217;px&#8217;,&#8217;important&#8217;);    el.style.setProperty(&#8216;max-width&#8217;,vw+&#8217;px&#8217;,&#8217;important&#8217;);    el.style.setProperty(&#8216;margin-left&#8217;,(-left)+&#8217;px&#8217;,&#8217;important&#8217;);  }  fit(); window.addEventListener(&#8216;resize&#8217;,fit); window.addEventListener(&#8216;load&#8217;,fit);  if(document.fonts&amp;&amp;document.fonts.ready) document.fonts.ready.then(fit);})();[\/tcb-script]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Toro Steel Buildings review: Modular Precast&#8217;s CEO on his 200&#215;525 industrial steel building, from design to completion in under six months.<\/p>\n","protected":false},"featured_media":81454,"template":"","video_category":[3755],"class_list":["post-74094","video_library","type-video_library","status-publish","has-post-thumbnail","hentry","post-wrapper","thrv_wrapper"],"_links":{"self":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/videos\/74094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/videos"}],"about":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/types\/video_library"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/media\/81454"}],"wp:attachment":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/media?parent=74094"}],"wp:term":[{"taxonomy":"video_category","embeddable":true,"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/video_category?post=74094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}