{"id":74094,"date":"2026-10-17T11:40:00","date_gmt":"2026-10-17T15:40:00","guid":{"rendered":"https:\/\/torosteelbuildings.com\/?post_type=video_library&#038;p=74094"},"modified":"2026-11-26T12:20:04","modified_gmt":"2026-11-26T17:20:04","slug":"toro-steel-buildings-review-modular-precast","status":"publish","type":"video_library","link":"https:\/\/torosteelbuildings.com\/es\/video-library\/toro-steel-buildings-review-modular-precast\/","title":{"rendered":"Toro Steel Buildings Review | CEO of Modular Precast on Large Industrial Facility Build"},"content":{"rendered":"<p><b>200&#215;525<\/b><span>Building footprint, in feet<\/span><b>~110,000<\/b><span>Sq ft, as Glenn describes it<\/span><b>20 acres<\/b><span>Modular Precast site<\/span><\/p>\n<h2>About this video: an industrial steel building review from the CEO of Modular Precast<\/h2>\n<p>In this 4:35 video, Glenn Pestron, CEO of Modular Precast, reviews the large industrial steel building Toro supplied for his precast concrete business. He explains why conventional construction wouldn&#8217;t have met his timeline, how Toro planned around specialized equipment from Germany, and why he calls Toro&#8217;s drawings and process clear enough for anyone to follow.<\/p>\n<p>His facility is one of Toro&#8217;s large <a href=\"\/steel-building-types\/manufacturing-facilities\/\">manufacturing facilities<\/a>, the kind of project Toro&#8217;s <a href=\"\/special-projects\/enterprise-customers\/\">enterprise team<\/a> handles, engineered in-house by <a href=\"\/about\/engineering\/\">Toro&#8217;s engineering team<\/a>.<\/p>\n<p>See more crane-ready, clear-span projects like this on our <a href=\"https:\/\/torosteelbuildings.com\/steel-building-types\/industrial-steel-buildings\/\">industrial steel buildings<\/a> page.<\/p>\n<ul aria-label=\"What the video shows\">\n<li><b>The only solution on his timeline.<\/b> Glenn says conventional construction wouldn&#8217;t have worked in the time frame he needed.<\/li>\n<li><b>Planned around equipment from Germany.<\/b> Toro coordinated with overseas engineers so the specialized equipment would fit the space.<\/li>\n<li><b>Clear drawings and a set schedule.<\/b> He says the delivery dates were exact and the drawings were clear enough for any layperson to follow.<\/li>\n<\/ul>\n<h3>Video details<\/h3>\n<p>Length4:35PublishedFebruary 13, 2026Channel<a href=\"https:\/\/www.youtube.com\/@ToroSteelBuildings\" target=\"_blank\" rel=\"noopener\">Toro Steel Buildings<\/a>FeaturingGlenn Pestron, CEO of Modular PrecastBuilding200x525 industrial steel buildingUsePrecast concrete productionTopicsCustomer review, industrial buildings<a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo\" target=\"_blank\" rel=\"noopener\">Watch on YouTube<\/a><\/p>\n<h2>Key moments in the video<\/h2>\n<p>Jump to any part of the 4:35 video on <a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo\" target=\"_blank\" rel=\"noopener\">YouTube<\/a>.<\/p>\n<ol>\n<li>0:01<span><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=1s\" target=\"_blank\" rel=\"noopener\"><b>The only solution<\/b><\/a><span>Glenn says conventional construction wouldn&#8217;t have worked in the time frame they needed.<\/span><\/span><\/li>\n<li>0:28<span><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=28s\" target=\"_blank\" rel=\"noopener\"><b>A 110,000 sq ft facility<\/b><\/a><span>He introduces Modular Precast, a 20-acre site with a building of about 110,000 sq ft.<\/span><\/span><\/li>\n<li>0:46<span><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=46s\" target=\"_blank\" rel=\"noopener\"><b>Why they chose Toro<\/b><\/a><span>Toro&#8217;s name kept coming up through friends, architects and engineers, and its portfolio impressed him.<\/span><\/span><\/li>\n<li>1:20<span><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=80s\" target=\"_blank\" rel=\"noopener\"><b>Planning around his expectations<\/b><\/a><span>Toro took the time to understand his budget, timeline and constructibility needs, and planned for barriers in advance.<\/span><\/span><\/li>\n<li>1:48<span><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=108s\" target=\"_blank\" rel=\"noopener\"><b>Coordinating with engineers in Germany<\/b><\/a><span>Toro worked with overseas engineers so specialized equipment from Germany would fit the space.<\/span><\/span><\/li>\n<li>2:25<span><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=145s\" target=\"_blank\" rel=\"noopener\"><b>Open to feedback, on schedule<\/b><\/a><span>Toro exceeded expectations on timeline and delivery, and made the tweaks his envelope consultant suggested.<\/span><\/span><\/li>\n<li>2:53<span><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=173s\" target=\"_blank\" rel=\"noopener\"><b>A schedule you could set a stopwatch on<\/b><\/a><span>Delivery dates were exact, site plans were laid out in advance, and the drawings were clear and simple to follow.<\/span><\/span><\/li>\n<li>4:01<span><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=241s\" target=\"_blank\" rel=\"noopener\"><b>Would he recommend Toro?<\/b><\/a><span>Glenn says he is extremely satisfied and would recommend Toro for cost, speed, organization and quality.<\/span><\/span><\/li>\n<\/ol>\n<p>Read the video transcript<\/p>\n<p>The only solution<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=1s\" target=\"_blank\" rel=\"noopener\">0:01<\/a> It was the only solution. Period. Full stop. Conventional construction would not have worked in the time frame that we needed it.<\/p>\n<p>A 110,000 sq ft facility<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=28s\" target=\"_blank\" rel=\"noopener\">0:28<\/a> My name is Glenn Pestron, and I&#8217;m the CEO of Modular Precast. We&#8217;re sitting on 20 acres. Our building is approximately 110,000 square feet.<\/p>\n<p>Why they chose Toro<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=46s\" target=\"_blank\" rel=\"noopener\">0:46<\/a> We were investigating various manufacturers. Toro&#8217;s name kept popping up, not only through references from friends, but through architects and engineers. So it was pretty well through word of mouth, I would say.<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=56s\" target=\"_blank\" rel=\"noopener\">0:56<\/a> When we finally had a chance to meet Toro face to face and review their portfolio, it was incredibly impressive: the size of buildings that they&#8217;ve done, the locations, multinational buildings, understanding building codes, and the ability to translate all those requirements into a final product.<\/p>\n<p>Planning around his expectations<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=80s\" target=\"_blank\" rel=\"noopener\">1:20<\/a> The overall experience was excellent. What I really enjoyed the most was that first sit-down and the time that they took to understand my expectations on all levels: budget, timewise, constructibility. They were very forthcoming with any barriers that they could have encountered, and they already had a plan in place on how to deal with them. That really was the icing on the cake for us.<\/p>\n<p>Coordinating with engineers in Germany<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=108s\" target=\"_blank\" rel=\"noopener\">1:48<\/a> We had very specific equipment requirements coming in from Germany, and Toro coordinated with the overseas engineers to ensure that everything would fit within the space.<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=119s\" target=\"_blank\" rel=\"noopener\">1:59<\/a> Having that first meeting together and setting all those expectations, it didn&#8217;t really start off as a venture. It was more like a bunch of guys getting together at a pub for a beer, and that same energy kept going. Yes, there were problems and tense moments, but everybody kept coming back to the table for a solution, and I think it&#8217;s because the intention was there to give us a quality product.<\/p>\n<p>Open to feedback, on schedule<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=145s\" target=\"_blank\" rel=\"noopener\">2:25<\/a> They exceeded expectations: timeline, product, delivery. I cannot believe how open they were. We actually brought an envelope consultant in to make sure we had designed things properly. They were very open to understanding our needs and to constructive criticism. There were some areas where the consultant pointed out a few little tweaks that needed to be done. Toro was there, no questions asked, and got it done, because they knew it was a better way to build.<\/p>\n<p>A schedule you could set a stopwatch on<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=173s\" target=\"_blank\" rel=\"noopener\">2:53<\/a> The date they gave us, you could have set your stopwatch on it. They told us how many trailers were going to be set up in a day and where their cranes were going to be. They even put an X on where their job shack and office was going to be and made sure they cleared it with us. They gave me a laid-out drawing of which members were going to go where, and where all the miscellaneous equipment was going to go: their crane, their forklifts. It was excellent.<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=196s\" target=\"_blank\" rel=\"noopener\">3:16<\/a> The drawings are absolutely crystal clear. Any layman can pick them up and understand them. They were very clear on the drawings they gave us to prepare the site and the footings: clear, concise, and this clear, logical process was followed all the way through.<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=214s\" target=\"_blank\" rel=\"noopener\">3:34<\/a> It&#8217;s really simple. Structure goes up, siding goes up, roof goes up, and it&#8217;s a real simple thing to follow. It&#8217;s an open book: you can see how fast production is going. They have an assembly piece count. It&#8217;s like the IKEA of buildings. If there&#8217;s a problem, you&#8217;ll know right away. There&#8217;s no black magic in this. It&#8217;s super simple and easy.<\/p>\n<p>Would he recommend Toro?<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=g6qdJ4EhuSo&amp;t=241s\" target=\"_blank\" rel=\"noopener\">4:01<\/a> Extremely satisfied with our Toro building. I would recommend Toro. As I said before: cost, speed, organization and quality, it&#8217;s all there. And having that team effort, and putting your interpretations of success before theirs, is what really differentiates them.<\/p>\n<p>Transcript lightly edited for readability. Music-only sections are left out.<\/p>\n<h2>The building in this video<\/h2>\n<p>A 200&#215;525 Toro industrial steel building on Modular Precast&#8217;s 20-acre site, used for precast concrete production.<\/p>\n<p>From 0:28<\/p>\n<h3>Glenn Pestron<\/h3>\n<p><span>CEO, Modular Precast<\/span><\/p>\n<p>Glenn chose Toro after its name kept coming up through friends, architects and engineers. He says Toro took the time to understand his budget, timeline and constructibility needs, and coordinated with overseas engineers so his equipment from Germany would fit the space.<\/p>\n<blockquote><p>\u201cIt was the only solution. Period. Full stop.\u201d<\/p><\/blockquote>\n<p>From 2:53<\/p>\n<h3>On schedule, with clear drawings<\/h3>\n<p><span>Planning, drawings and site layout<\/span><\/p>\n<p>He says Toro&#8217;s delivery dates were exact and the site plan showed where trailers, cranes and equipment would go. He describes the drawings, including those for preparing the site and footings, as clear enough for any layperson to follow.<\/p>\n<blockquote><p>\u201cIt&#8217;s like the IKEA of buildings.\u201d<\/p><\/blockquote>\n<blockquote><p>\u201cCost, speed, organization and quality, it&#8217;s all there.\u201d<\/p><\/blockquote>\n<p>Glenn Pestron, CEO of Modular Precast, at 4:01 in the video<img data-opt-id=831668801  fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/i.ytimg.com\/vi\/g6qdJ4EhuSo\/maxresdefault.jpg\" alt=\"Video thumbnail of the 200x525 Modular Precast steel building under construction, with white wall panels, a crane and parked trucks, and the caption &quot;CEO Review: 200&#039;W x 525&#039;L x 46&#039;H&quot;\" width=\"1280\" height=\"720\" loading=\"lazy\" title=\"\">Modular Precast&#8217;s 200&#215;525 building<\/p>\n<p>Every Toro building is engineered in-house for your site&#8217;s snow, wind and seismic loads and comes with engineer-stamped drawings. Buildings are made in 30+ manufacturing facilities certified to standards including CSA A660, CWB, AISC and AWS D1.1. Engineering is led by <a href=\"\/about\/noah-sinclair\/\">Noah Sinclair, our in-house structural engineer<\/a>.<\/p>\n<h2>Questions about large industrial steel buildings<\/h2>\n<p>Still unsure? <a href=\"\/price-my-building\/\">Price your building<\/a> and a building specialist will walk you through it.<\/p>\n<p>Can a steel building be faster than conventional construction?<\/p>\n<p>Glenn says conventional construction wouldn&#8217;t have worked in the time frame Modular Precast needed, and that Toro exceeded expectations on timeline and delivery. Timing for your project depends on its size and complexity, so your building specialist will confirm it.<\/p>\n<p>Can Toro design around specialized equipment?<\/p>\n<p>Yes. For Modular Precast, Toro coordinated with overseas engineers so equipment coming from Germany would fit within the space. Share your equipment requirements early so they can be engineered into the building.<\/p>\n<p>How big can a Toro steel building be?<\/p>\n<p>Modular Precast&#8217;s building is 200&#215;525, about 110,000 sq ft by Glenn&#8217;s description. Toro engineers buildings to the size each project needs, with red iron buildings clear-spanning up to about 300 ft.<\/p>\n<p>Are the drawings easy to follow?<\/p>\n<p>Glenn describes Toro&#8217;s drawings as crystal clear, including those for preparing the site and footings. Every Toro building comes with engineer-stamped drawings for its location.<\/p>\n<p>Does Toro supply the foundation?<\/p>\n<p>No. Toro provides the structural reactions for every building, so a local contractor can build the foundation to spec. Anchor bolts are included with cold-formed buildings and are an add-on for arch and red iron buildings.<\/p>\n<p>How much does an industrial steel building cost?<\/p>\n<p>Toro steel building kits start at $19 USD per sq ft in the U.S. and $26 CAD per sq ft in Canada. Your site&#8217;s loads and codes, along with size, framing system, openings and options, have a big impact on the final price, so reach out for pricing on your specific building.<\/p>\n<h2>Related videos<\/h2>\n<p><a href=\"\/video-library\/200x525-industrial-steel-building\/\"><b>200&#215;525 industrial building<\/b><span>The precast facility going up<\/span><\/a><a href=\"\/video-library\/200x525-precast-facility-construction-update\/\"><b>200&#215;525 construction update<\/b><span>Progress on the precast facility<\/span><\/a><a href=\"\/video-library\/toro-steel-buildings-from-blueprint-to-reality\/\"><b>From blueprint to reality<\/b><span>Customers on custom Toro buildings<\/span><\/a><a href=\"\/video-library\/150x300x27-industrial-steel-building-review\/\"><b>150x300x27 warehouse review<\/b><span>Another industrial customer<\/span><\/a><\/p>\n<p>Browse every video in the <a href=\"\/resources\/video-library\/\">Toro video library<\/a>, read more <a href=\"\/about\/testimonials\/\">customer testimonials<\/a>, or see Toro&#8217;s <a href=\"\/steel-building-types\/manufacturing-facilities\/\">manufacturing facilities<\/a>, <a href=\"\/steel-building-types\/warehouses\/\">warehouses<\/a>, <a href=\"\/steel-building-types\/commercial\/\">commercial buildings<\/a> and <a href=\"\/special-projects\/enterprise-customers\/\">enterprise projects<\/a>.<\/p>\n<p>[tcb-script](function(){ var el=document.getElementById(&#8216;tvd2&#8217;); if(!el) return; function fit(){ el.style.setProperty(&#8216;margin-left&#8217;,&#8217;0px&#8217;,&#8217;important&#8217;); el.style.setProperty(&#8216;margin-right&#8217;,&#8217;0px&#8217;,&#8217;important&#8217;); el.style.setProperty(&#8216;width&#8217;,&#8217;auto&#8217;,&#8217;important&#8217;); var vw=document.documentElement.clientWidth, left=el.getBoundingClientRect().left; el.style.setProperty(&#8216;width&#8217;,vw+&#8217;px&#8217;,&#8217;important&#8217;); el.style.setProperty(&#8216;max-width&#8217;,vw+&#8217;px&#8217;,&#8217;important&#8217;); el.style.setProperty(&#8216;margin-left&#8217;,(-left)+&#8217;px&#8217;,&#8217;important&#8217;); } fit(); window.addEventListener(&#8216;resize&#8217;,fit); window.addEventListener(&#8216;load&#8217;,fit); if(document.fonts&amp;&amp;document.fonts.ready) document.fonts.ready.then(fit); })();[\/tcb-script]<\/p>\n","protected":false},"featured_media":81882,"template":"","video_category":[3755],"class_list":["post-74094","video_library","type-video_library","status-publish","has-post-thumbnail","hentry","post-wrapper","thrv_wrapper"],"_links":{"self":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/videos\/74094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/videos"}],"about":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/types\/video_library"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/media\/81882"}],"wp:attachment":[{"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/media?parent=74094"}],"wp:term":[{"taxonomy":"video_category","embeddable":true,"href":"https:\/\/torosteelbuildings.com\/es\/wp-json\/wp\/v2\/video_category?post=74094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}